Laserfiche WebLink
River Islands Development at Lathrop November 2020 <br /> Final Phase 2 Sewer Technical Report Rev 1 #6520 <br /> 2. River Islands Sewer Collection System <br /> 2.1 Existing River Islands Sewer Collection System <br /> 2.1.1 Interim Sewer Pump Station <br /> Construction of River Islands began in the early 2010s. Stages 1A and 1B are nearly completed and <br /> occupied and Stages 2A and 2B are currently under construction. Generated sewage from Stage 1A and <br /> 1 B is currently being conveyed from each point of connection, to the interim sewer PS located between <br /> Lakes 1 and 2 and north of Golden Valley Parkway. Per the City's Master Plan, the interim sewer PS was <br /> formally completed in 2017. It includes two 20-horsepower (hp) submersible pumps designed to provide <br /> 1,100 gallons per minute (GPM)at a total dynamic head (TDH)of 46.5-feet. The PS was initially designed <br /> to pump the raw sewage approximately 8,700 feet east to a manhole under Sadler Oak located within the <br /> Mossadale collection area. However, recent force main improvements have allowed for the station to pump <br /> directly to the City's CTF for treatment. <br /> 2.1.1.1 Capacity Evaluation <br /> A sewer pump/lift station firm pumping capacity is required to be equal to the ultimate PWWF of the <br /> collection area,with the firm pumping capacity defined as the total pumping capacity of all the pumps minus <br /> the capacity of the largest pump (see Section 4.2). The interim sewer PS has firm pumping capacity of <br /> 1,100 GPM which is equivalent to an ADWF of 511 GPM when using the City Detail S-1 sanitary sewer <br /> peaking factors. As of June 2019, the interim sewer lift station has an average flow rate of 213,500 GPD <br /> or 150 GPM which is still below the maximum ADWF the station is rated for. It is recommended that the <br /> influent flows are regularly monitored to help accurately predict when the station is approaching its capacity. <br /> Sewer Pump Station A2 (Site C) is currently under construction. Before the influent flows exceed the <br /> capacity of the interim sewer PS, the new sewer pump station A2 will be brought online to accommodate <br /> additional land developments. The City plans on decommissioning the interim sewer PS and transferring <br /> the 20-hp submersible pumps to pump station A2. <br /> 2.1.2 Existing River Islands Recycled Water Flushing System <br /> Per Section 5-4.1 in the City Standards, main sewer lines should account for and be designed to transmit <br /> the ultimate buildout sewer flows, including potential tributary areas. As shown in Figure 2-1, Stage 1A will <br /> be located at the end of River Islands sewer collection system and will be required to handle flows from <br /> several tributary areas. Until full building conditions, the northern trunk line will experience low sewer flows <br /> which may lead to sediment/debris accumulation and potential odor and corrosion issues. To avoid these <br /> problems, flushing stations have been designed to occasionally add flow from recycled water mains into <br /> the sewer system, flushing any accumulated sediment/debris. <br /> The original recycled water flushing station, located at the intersection of Lakeside Drive and Somerston <br /> Parkway, has been removed as a result of the ongoing expansions in the collection system. A new 1,100 <br /> GPM flushing station, located along River Islands Parkway within Stage 2A, has been installed upstream <br /> of the original station to flush out the north trunk line of accumulated sediments and reduce odor and <br /> corrosion issues. During the initial startup of the flushing station, operators will be able to calibrate <br /> approximate flushing time intervals based on observations in the field. <br /> 2.2 Phase I and II River Islands Sewer Collection System <br /> At full buildout, River Islands sewer collection system is proposed to consist of six sewer collection areas <br /> with collection areas Al and A2 located within Phase I and the proposed collection areas C1, C2, B1, and <br /> B2 located within Phase Il. Each collection area is/recommended to convey the generated sewage from <br /> each POC to the collection area's sewer lift or pump station by gravity. Collection areas C1, C2, B1, B2, <br /> 8 <br />