Laserfiche WebLink
River Islands Development at Lathrop November 2020 <br /> Final Phase 2 Sewer Technical Report Rev 1 #6520 <br /> and Al will be equipped with sewer lift stations designed to lift the HGL of the collected sewage allowing <br /> gravity flows to continue onto the next collection system. <br /> All of the generated sewage from River Islands is proposed to be conveyed to area's A2 pump station (also <br /> referred to as Site C) located along J7 Street in the south east of River Islands (see Figure 2-1). The A2 <br /> pump station will pump raw sewage directly to the Lathrop CTF through the existing 12 and 18-inch force <br /> mains. <br /> 2.2.1 Land Uses <br /> O'Dell Engineering, serving as the civil engineer for the River Islands Development, provided land use <br /> exhibits showing each parcel's boundaries and land uses for Phases I and II (see Appendix A) in <br /> accordance with the City's Requirements. The River Islands development will consist of low, medium and <br /> high density residential, schools/institutional, parks, and commercial land uses. The employment centers <br /> located in the south of the River Islands development will be categorized as commercial land uses. Table <br /> 2-1 shows the total number of units and acreage of each land use within the River Islands Development. <br /> Table 2-1: River Islands Land Uses <br /> Area Area Area Area Area Area <br /> Land Use C1 C2 B1 B2 Al A2 Total <br /> Low Density Residential (DUs) 783 931 876 1,091 1,998 1,512 7,191 <br /> Medium Density Residential (DUs) 258 602 1,150 789 723 114 3,636 <br /> High Density Residential (DUs) 0 0 1,562 1,641 312 668 4,183 <br /> Commercial (acres) 0.0 0.0 0.0 56.0 0.0 202.4 258.4 <br /> Industrial (acres) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br /> Parks (acres) 26.6 37.0 56.9 61.4 88.0 71.9 341.8 <br /> Schools/ Institutional (acres) 14.6 19.3 0.0 30.0 64.0 34.1 162.0 <br /> 9 <br />