Laserfiche WebLink
River Islands Development at Lathrop November 2020 <br /> Final Phase 2 Sewer Technical Rei3ort Rev 1 #6520 <br /> Table 6-5: Sewer Collection Area B1 — Land Uses, ADWF, and PWWF <br /> Land Use <br /> Area B1 Sewer Flow Average Dry <br /> Total No of DU Factor Weather Flow <br /> Land Use /Acres (GPD/du or ac) (GPD) <br /> Low Density Residential (per DU) 876 200 175,200 <br /> Medium Density Residential (per DU) 1,150 180 207,000 <br /> High Density Residential (per DU) 1,562 170 265,540 <br /> Commercial (per acre) 0 590 0 <br /> Industrial (per acre) 0 355 0 <br /> Parks (per acre) 57 55 3,130 <br /> Schools/ Institutional (per acre) 0.0 245 0 <br /> Total Area B1 Average Dry Weather Flow 650,870 <br /> Peaking Factor 2.19 <br /> Peak Wet Weather Flow' 1,424,966 <br /> Notes: <br /> 1. PWWF shown is based on the ADWF from area B1 conveyed to the proposed sewer lift station LS-B1. <br /> 6.4.2 Sewer Lift Station B1 (LS-131)— Preliminary Firm Pumping Capacity Requirements <br /> The firm pumping capacity for lift station B1 should be equal to the PWWF of 1,424,966 GPD or 990 GPM. <br /> This exceeds 1.0 cfs (or 450 GPM), and therefore a low flow pump should be provided and designed for <br /> 50-100 GPM. As described in Section 2.2.3, the design TDH for LS-131 pumps should consider the <br /> secondary requirement of being able to utilize the interim/emergency bypass pipelines. During the design <br /> of Phase II's sewer collection system, the sewer model should be updated based the proposed interim and <br /> future emergency situations to provide TDH sizing parameters for the LS-B1 pumps. <br /> Table 6-6: Sewer Lift Station Area B1 (LS-B1)— Preliminary Firm Pumping Capacity Requirements <br /> Parameter Pumping Capacity <br /> Low Flow Pump Capacity 50-100 GPM <br /> Preliminary Required Firm Pumping Capacity 1,424,966 GPD or <br /> 990 GPM <br /> 6.5 Sewer Collection Area B2— Preliminary Steady State Results <br /> 6.5.1 Sewer Collection Area B2—Land Uses,Average Dry Weather Flows,and Peak Wet Weather Flows <br /> Sewer Collection Area B2 is proposed to be located in the South of Phase II and is bounded by Collection <br /> Area Al in the North, Collection Area A2 in the east, the Paradise Cut in the South and Collection Area B1 <br /> in the west. B2 is approximately 605 acres composed of all land uses except industrial. Based on <br /> conversations with River Islands, the future employment centers should be modeled as commercial land <br /> uses. Table 6-7 lists the total number of dwelling units or acreage of each land use in collection area B2, <br /> and the ADWF in gallons per day. <br /> At full buildout and under normal operating conditions, LS-B1 will pump Area B1's sewage into Area 132's <br /> collection system along A Street. Per the City Standards, the PWWF conveyed to the proposed sewer lift <br /> station B2 (LS-132) is 2,746,811 GPD based on the combined ADWF from areas B1 and B2. <br /> 24 <br />