My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
River Islands Development at Lathrop November 2020 <br /> Final Phase 2 Sewer Technical Report Rev 1 #6520 <br /> Table 6-7: Sewer Collection Area B2— Land Uses, ADWF, and PWWF <br /> Land Use <br /> Area B2 Sewer Flow Average Dry <br /> Total No of DU Factor Weather Flow <br /> Land Use or Acres (GPD/du or ac) (GPD) <br /> Low Density Residential (per DU) 1,091 200 218,200 <br /> Medium Density Residential (per DU) 789 180 142,020 <br /> High Density Residential (per DU) 1,641 170 278,970 <br /> Commercial (per acre) 56.0 590 33,016 <br /> Industrial (per acre) 0.0 355 0 <br /> Parks (per acre) 61.4 55 3,375 <br /> Schools/ Institutional (per acre) 30.0 1 245 7,350 <br /> Total Area B2 Average Dry Weather Flow 682,931 <br /> Total Area 131 Average Dry Weather Flow 650,870 <br /> Total Area 131 + B2 Average Dry Weather Flow 1,333,801 <br /> Peaking Factor 2.06 <br /> Peak Wet Weather Flow' 2,746,811 <br /> Notes: <br /> 1. PWWF shown is based on the ADWF from areas B1 and B2 conveyed to the proposed sewer lift station LS- <br /> B2 <br /> 6.5.2 Sewer Lift Station B2 LS-132— Preliminary Firm Pumping Capacity <br /> Under normal operating conditions, the model results determined the Sewer Lift Station B2 should have a <br /> firm pumping capacity of 2,746,811 GPD or 1,908 GPM. Also a low flow pump designed for 95-191 GPM <br /> should be provided. <br /> Table 6-8: Sewer Lift Station Area B2— Preliminary Firm Pumping Capacity Requirements <br /> Parameter Pumping Capacity <br /> Low Flow Pump Capacity 95-191 GPM <br /> Preliminary Required Firm Pumping Capacity 2,746,811 GPD or <br /> 1,908 GPM <br /> At full buildout and under normal operating conditions, Table 6-9 summarizes ADWF and PWWF (firm <br /> pumping capacity) required for each lift station in Collection Area C1, C2, B1, & B2. <br /> Table 6-9: Summary of Collection Areas C1, C2, 131 & B2 Model Results <br /> Proposed Proposed Proposed Proposed <br /> Sewer Lift Sewer Lift Sewer Lift Sewer Lift <br /> Station Station Station Station <br /> Parameter LS-C1 LS-C2 LS-131 LS-132 <br /> Average Dry Weather Flow (GPD) 208,082 509,409 650,870 1,333,801 <br /> Peak Wet Weather Flow(GPD) 593,236 1,168,388 1,424,966 2,746,811 <br /> Low Flow Pump Required (Yes/No) No Yes Yes Yes <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.