My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2 Stormwater evacuation path <br /> Ultimately, all the stormwater runoff from both Phase 1 and Phase 2 of the River Islands development will <br /> be drained to Paradise cut via the Phase 2 pump station located west of lake 12. As shown in Figure 1-5, <br /> the pump station is connected to lakes 12, 19 and 22 in Watershed C', C and B respectively and thus the <br /> last link in the stormwater evacuation path for all three watersheds. Phase 1 (watershed A, plus lakes 12 <br /> and 13) stormwater runoff is evacuated from the lakes in Phase 1 either directly to the Phase 2 pump <br /> station via lake 12 or via Pump Station A (located by lake 3)which pumps the water to lake 25 in Phase 2 <br /> (watershed B). <br /> While not included in the modelling or analysis presented in this report, there is an additional stormwater <br /> drainage path for Phase 1 lakes to Phase 2 and Paradise Cut that could be created at a later time, if <br /> deemed necessary. This path would consist of a lake interconnect pipe between lake 11 (Phase <br /> 1/watershed A) and lake 25 (Phase 2/watershed B) offering a third Phase 1-Phase 2 connection. <br /> The Phase 2 pump station will house 3+1 standby stormwater evacuation pumps operating at 25cfs each <br /> totaling 75cfs. The pump settings used for the modelling of the 100-year 48-hour storm is described in <br /> Section 3.2.1. <br /> � l <br /> rT 9 <br /> .�0l9a�F <br /> \\ RwY o LAKE <br /> CIRCU ATION <br /> MOY � MOV <br /> L <br /> I I I I <br /> '2 I YB I YB I 7 I <br /> ® ® ® P4 II IRRIGATION STATION <br /> I I <br /> I I <br /> I I <br /> TO LANDSCAPE <br /> IRRIGATION <br /> I I I <br /> I <br /> I <br /> m <br /> I <br /> I <br /> I I <br /> 5111111 I I <br /> I I <br /> IRRIGATION qIR GAP <br /> �ls {ABOVE) . _ <br /> y Iake,z <br /> � 1:11 him o I ♦II0 0I� � <br /> POTABLE REIMM AIVEA )BELOW) <br /> WATER WATER WARR <br /> lake 27, � I I <br /> I I <br /> li <br /> Figure 1-5: Schematic plan view of the Phase 2 pump station. <br /> Note:The irrigation and recirculation features shown for schematic only. <br /> While technically located in watershed C(see Figure 1-1), lake 12 constitutes the connection of watershed A to the Phase 2 pump <br /> station as lake 12 in turn is directly connected to the watershed A lake system. <br /> 2 For reference,each pump at pump station A has a capacity of 12.5cfs. <br /> River Islands Phase 2 Stormwater Mitigation Rev 2 6 1� <br /> PACE <br />
The URL can be used to link to this page
Your browser does not support the video tag.