Laserfiche WebLink
The change of Phase boundaries may also reflect the stage division for the respective Phases. However, <br /> since the "Stage 213" division is still treated as its own subdivision for other water supply purposes (e.g. <br /> Non Potable Water) and as Phase 2 is yet to have stage divisions, a non-stormwater division of the <br /> stages is not provided at this time. Figure 1-4 below shows the "original" stage division of Phase 1, <br /> hereafter referred to as the stormwater stage division referring the reasoning from above section. <br /> alb <br /> v <br /> �9NASE 1-STAGES <br /> Figure 1-4: River Islands Phase 1, Stage Division from a storm water perspective <br /> AREA LEFT INTENTIONALLY BLANK <br /> River Islands Phase 2 Stormwater Mitigation Rev 2 5 1� <br /> PACE <br />