My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3 Lake Interconnection pipe lengths <br /> The lengths for the lake interconnection pipes were collected from the suggested Lake Piping Exhibits, <br /> see Appendix C. <br /> After the length was measured, an additional 10% of total pipe length was added to account for any <br /> fittings and bends. The velocity is not expected to reach any values that causes significant friction loss, <br /> but the extra length was added as a conservative measure. Table 2-2 on the following page shows the <br /> measured lengths between the lakes in Phase 2 as well as the lengths including the additional 10% that <br /> was used in the analysis. The link between two lakes may be listed more than once as all conduits <br /> between the lakes are listed individually (main lake interconnection pipes and overflow pipes). The pipe <br /> lengths between two of the same lakes are, however, the same for all conduits between them, as shown <br /> in Table 2-2 on the following page. All conduits for Phase 2 are assumed to be 48-inches with a 12" <br /> overflow pipe except for the conduit connecting lake 19 to the Phase 2 pump station wet well and the <br /> conduit connecting lake 22 to the Phase 2 pump station wet well which are both 60-inches. Figure 2-6 <br /> (reduced size version of the Lake Piping Exhibit from Appendix C) shows the layout for Phase 2 of the <br /> lake interconnection pipes and the pipes connecting lakes to the stormwater evacuation pump station <br /> (Phase 2 pump station). <br /> r• <br /> ImSN <br /> UY <br /> ��—.r"�-nom •� ��`� l � ``'��` _. _ <br /> PRASE2 <br /> LAKE PIPING EXHIBIT ;tea <br /> " RIVER ISLANDS <br /> c Ri�u�wr swacroonoswn eun�wi <br /> Figure 2-6: Lake interconnection pipe and pump station connection layout <br /> River Islands Phase 2 Stormwater Mitigation Rev 2 12 <br /> PACE <br />
The URL can be used to link to this page
Your browser does not support the video tag.