Laserfiche WebLink
Table 2-2: Pipe Lengths and Invert Elevations for Phase 2 <br /> Link Length 110% Length Upstream Invert Downstream <br /> Name Conduit Name [feet] [feet] Elevation [feet] Invert Elevation <br /> [feet] <br /> EVAC-A EVAC-A.1 5633 6196 0 0 <br /> EVAC-CB EVAC-BC 8600 9460 0 0 <br /> LC-12.WWa LC-12.WWa-32 100 110 0 0 <br /> LC-12.WWb LC-12.WWb-48 2663 2930 0 0 <br /> LC-14.19 LC-14.19-12 1319 1452 6.5 6.5 <br /> LC-14.19 LC-14.19-48 1319 1452 0 0 <br /> LC-15.18 LC-15.18-12 1591 1757 6.5 6.5 <br /> LC-15.18 LC-15.18-48 1597 1757 0 0 <br /> LC-16.17 LC-16.17-12 164 181 6.5 6.5 <br /> LC-16.17 LC-16.17-48 164 181 0 0 <br /> LC-17.18 LC-17.18-12 1234 1358 6.5 6.5 <br /> LC-17.18 LC-17.18-48 1234 1358 0 0 <br /> LC-18.19 LC-18.19-12 1147 1262 6.5 6.5 <br /> LC-18.19 LC-18.19-48 1147 1262 0 0 <br /> LC-19.WW LC-19.WW-60 1636 1800 0 0 <br /> LC-20.21 LC-20.21-12 1129 1242 6.5 6.5 <br /> LC-20.21 LC-20.21-48 1129 1242 0 0 <br /> LC-21.22 LC-21.22-12 967 1064 6.5 6.5 <br /> LC-21.22 LC-21.22-48 967 1064 0 0 <br /> LC-22.23 LC-22.23-12 1676 1845 6.5 6.5 <br /> LC-22.23 LC-22.23-48 1676 1845 0 0 <br /> LC-22.24 LC-22.24-12 1760 1937 6.5 6.5 <br /> LC-22.24 LC-22.24-48 1760 1937 0 0 <br /> LC-22.WW LC-22.WW-60 1400 1540 0 0 <br /> LC-23.25 LC-23.25-12 946 1041 6.5 6.5 <br /> LC-23.25 LC-23.25-48 946 1041 0 0 <br /> LC-24.25 LC-24.25-12 I 526 579 6.5 6.5 <br /> LC-24.25 LC-24.25-48 526 579 0 0 <br /> LC-25.26 LC-25.26-12 3428 3772 6.5 6.5 <br /> LC-25.26 LC-25.26-48 3428 3772 0 0 <br /> LC-3.26 LC-3.26-12 2386 2625 6.5 6.5 <br /> LC-3.26 LC-3.26-48 2386 2625 0 0 <br /> Link.WW Link.WW n/a 33 0 0 <br /> River Islands Phase 2 Stormwater Mitigation Rev 2 13 11 <br /> PACE <br />