Laserfiche WebLink
3.3 List of Modelled Scenarios for Phase 2 <br /> Reference to the different models/scenarios are made using the nomenclature of the variables described <br /> in the previous sections, including both nomenclature from phase 1 and 2. When combining the different <br /> categories, a unique ID for referencing a specific model/scenario is created. This nomenclature is used <br /> when referring to the different model configurations henceforth. An example is presented below. <br /> Example: Alt 6-L-ca-V20-PS-D-48-d refers to the modelling scenario where there are the equivalent of <br /> 811 (5 actual pumps12) unit pumps active in watersheds A, B and C (Alt6), watershed A pump station is <br /> pumping into lake 25(L) and phase 2 lake hydrographs are based on approximated contributory drainage <br /> area (ca). Lake 12 is connected to the Phase 2 Pump station (PS). Phase 1 pipes are altered from their <br /> as built conditions per model D (D). The 48-hour 100-year storm event is analyzed (48) for the dynamic <br /> scenario where the pumps are turned on (d). <br /> The list below presents all the analyzed scenarios using the nomenclature described above. <br /> Phase 2 models: <br /> 1. Alt6-LAKE-V20-ca-PHAS E 2 PUMP STATION-D-48-d and s <br /> 2. Alt6-LAKE-V20-la- PHASE 2 PUMP STATION -D-48-d and s <br /> Notes: <br /> 1. As the list above shows, the "D" part (referring to some Phase 1 nomenclature) of the model <br /> configuration names are identical for all phase 2 model configurations. This may seem <br /> unnecessary to include at present but these index are kept for easier reference to important <br /> model information as well as to distinguish between these models and other models that may be <br /> created in the future. <br /> 2. As per Note 1 above, most of the Phase 2 model configuration nomenclature (Alt6-LAKE-V20" <br /> as well as "PHASE 2 PUMP STATION) is the same for both model configurations. This may also <br /> seem unnecessary to include at present but these index are kept for easier reference and to not <br /> confuse these Phase 2 models configurations with those from previous revisions of this report. <br /> 11 As described in Section 1.2,the actual Phase 2 Pump station will have 3 active pumps with twice the flow compared to the"unit <br /> pump",thus totaling a capacity of 2x3=6 unit pumps at the Phase 2 pump station.Phase 1 pump station(pump station A)will have 2 <br /> active unit pumps. <br /> 12 idem <br /> River Islands Phase 2 Stormwater Mitigation Rev 2 19 1� <br /> PACE <br />