My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
River Islands Development at Lathrop January 2021 <br /> Final River Islands Potable Water Technical Report—Rev 3 #6520 <br /> 2.5 Potable Water Pumping Capacity Requirements — Phase I City of Lathrop Potable Water <br /> Storage and Booster Pump Station at River Islands <br /> Per Section 4-4.2 in the City Standards, PW distribution systems shall be sized to adequately, dependably, <br /> and safely supply potable water demands under maximum conditions. The City Standards define maximum <br /> conditions as the higher of either the maximum day demands plus the largest fire flow requirement or peak <br /> hour demands. At full buildout, the largest fire flow requirement is 3,000 GPM and the MDD is 5,186 GPM. <br /> This is equal to 9,186 GPM which is less the PHD of 10,372 GPM. Therefore, at full buildout conditions, <br /> the required firm pumping capacity of the River Islands distribution system must be at least 10,372 GPM <br /> (PHD) as required by the City's Standards. Section 4-5.7 and Appendix H in the City Standards defines <br /> firm pumping capacity at a pump station as the total pumping capacity of all the pumps minus the capacity <br /> of the largest pump. <br /> The Phase I City of Lathrop PW Pump Station at River Islands (also known as Phase I BPS and previously <br /> referred to as Site B) was designed with a firm pumping capacity equal to 10,000 GPM at full build out <br /> conditions. Table 2-7 below lists the rated capacities and number of pumps the Phase I BPS will be <br /> installed with at full build out conditions. <br /> Table 2-7: Phase I City of Lathrop Potable Water Storage and Booster Pump Station at River <br /> Islands— Firm Pumping Capacity <br /> Pumping <br /> Capacity <br /> (gpm) @ 197' Motor Rated Motor <br /> Pump Number TDH Horsepower Drive Status <br /> Variable <br /> Small Booster Pump#1 2,000 125 Frequency Duty <br /> Drive <br /> Variable <br /> Small Booster Pump#2 2,000 125 Frequency Duty <br /> Drive <br /> Variable <br /> Small Booster Pump#3 2,000 125 Frequency Duty <br /> Drive <br /> Large Booster Pump#1 4,000 250 Soft Starter Duty <br /> Large Booster Pump#2 4,000 250 Soft Starter Standby <br /> Total Firm Pumping Capacity Phase I BPS 10,000 <br /> Notes: <br /> 1. Phase I BPS will be designed to operate in a 4 duty+ 1 standby configuration, with one of the large booster <br /> pumps acting as the standby pump. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.