My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
River Islands Development at Lathrop January 2021 <br /> Final River Islands Potable Water Technical Report—Rev 3 #6520 <br /> 4 River Islands Potable Water Distribution System and Model <br /> 4.1 WaterGEMS Model <br /> Bentley's WaterGEMS for AutoCad 2019 water distribution analysis and design software, was used to <br /> conduct a steady state analysis of the River Islands PW distribution system under ADD, MDD, and PHDs. <br /> A steady-state analysis determines the operating behavior of the system at a specific point in time under <br /> steady-state conditions (flow rates and hydraulic grades remain constant over time). The results of the <br /> steady-state analysis helped determine the following performance criteria as required by the City's <br /> Standards and Water Master Plans. <br /> • Distribution System Pressures under ADD, MDD, and PHDs <br /> • Pipeline Velocities under ADD, MDD, and PHDs <br /> • Pipeline Headloss Gradients under ADD, MDD, and PHDs <br /> 4.1.1 WaterGems Model Basis and Assumptions <br /> The River Islands WaterGEMs model was created from a combination of as built drawings, issued for <br /> construction improvement plans, or preliminary PW utility exhibits. The AutoCad drawings were imported <br /> into WaterGEMS for AutoCad 2019 and the PW lines were converted into a hydraulic model. If <br /> improvement plans or as built drawings were available, the elevation of the PW lines, location and size of <br /> valves, and the location and size of fire hydrants were imported into the hydraulic model. As recommended <br /> in Section 7 of the City's Water Master Plan, the following baseline assumptions were used in the steady- <br /> state analysis. <br /> • All valves were assumed to have a minor loss coefficient equal to K=0.4. <br /> • All pipes were assigned a Hazen-Williams friction loss coefficient of 140. <br /> • The location of PW demands were assigned to the nearest applicable junction based on the <br /> location of the parcel's service lateral. No pipe laterals were modeled in this analysis. <br /> 4.1.1.1 Areas Without Finalized Improvement Plans Assumptions <br /> In locations where improvement plans or as built drawings were not available, the following was assumed <br /> in order to conduct a steady-state analysis. <br /> • The location of all PW lines were assumed to match the preliminary PW utility exhibits <br /> • The elevation of all PW lines were assumed to be 4 feet below the finished grade <br /> • Valves or fire hydrants were placed into the distribution model in accordance with the City <br /> Standards. <br /> • All unknowns needed to run a steady-state analysis, such as minimum pipe sizes, were assumed <br /> to the minimum requirements listed in the City Standards or Water Master Plan. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.