River Islands Development at Lathrop January 2021 <br /> Final River Islands Potable Water Technical Report—Rev 3 #6520 <br /> The following areas did not have finalized improvement plans and the assumptions listed above were utilize <br /> in order to model these demands. The total number of dwelling units or acreage of these areas was <br /> assigned based on projected quantities provided by River Islands. Ultimately, the model results should <br /> be revisited when the improvement plans for these areas become available. Please reference <br /> Appendix A for the location of these areas. <br /> • Employment Centers in Phase 1 B <br /> • Town Center in Phase 1 B <br /> • Village R in Phase 1 B <br /> • Village CC in Stage 2A <br /> • Village X in Stage 2A <br /> • Village KK and II in Stage 2B <br /> • All of Phase II <br /> 4.1.2 Fire Flow Analysis <br /> WaterGEMS has a fire flow analysis feature which determines the available fire flows under steady-state <br /> conditions at each junction or hydrants at a time. The available fire flows at a single junction/hydrant are <br /> determined after system wide demands have been satisfied and as long as specific operating criteria are <br /> satisfied. In other words, the fire flow analysis determines the available fire flows for a single fire event if it <br /> were to occur at each of the selected junctions or hydrants. <br /> Per Section 6 in City's Water Master Plan, the following operating constraints/requirements were inputted <br /> into the fire flow analysis. <br /> • The calculated available fire flows must also be provided in conjunction with the baseline demands. <br /> o For the purposes of seeing the performance of the system, fire flows were analyzed in <br /> conjunction with MDDs as required by the City requirements. <br /> • A minimum residual pressure at each junction or hydrant tested must be greater than or equal to <br /> 20 psi as fire flows are being extracted. <br /> • A minimum system wide pressure at each junction or hydrant must be greater than or equal to 20 <br /> psi during fire flow analysis. <br /> • The fire flow analysis shall simulate one 4,000 GPM fire flow event at each of the tested junctions <br /> or hydrants. If 4,000 GPM cannot be provided the model will determine the maximum available fire <br /> flows. <br /> o For the purposes of seeing the performance of the distribution system, the upper limit of <br /> the fire flow analysis was set at 4,000 GPM, even though the highest fire flow requirement <br /> for River Islands is 3,000 GPM. This will allow for future planning if the parcel's land uses <br /> are reclassified. <br /> • The maximum velocity in any distribution (non-service lateral) and transmission pipe shall not <br /> exceed 10 feet per second. <br /> 16 <br />