My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
River Islands Development at Lathrop January 2021 <br /> Final River Islands Potable Water Technical Report—Rev 3 #6520 <br /> River Islands' area of the distribution system as the City's distribution system operates as a single pressure <br /> zone, however, this operating scenario shall not be considered under normal operating conditions. <br /> At full buildout, Phase I BPS will consist of a 10,000 GPM firm pumping capacity pump station, 4.6 MG of <br /> storage through three separate tanks,secondary tank fill line, a free chlorine residual system and two 8,000- <br /> gallon hydro-pneumatic tanks on the pump station's discharge. The secondary tank fill line allows for the <br /> City's distribution system to back fill the storage tanks. Once completed, Phase I BPS will be owned, <br /> operated, and maintained by the City of Lathrop. <br /> 4.2.3.1 Phase I BPS Potable Water Storage Tanks <br /> As part of a steady-state analysis, all the potable water storage tanks were modeled as full (starting water <br /> level at each tank's high water level). It is recommended that prior to the start of the design of the <br /> proposed Phase II BPS and storage tank site that an extended state analysis be conducted to verify <br /> the storage tanks can be refilled during off-demand windows. This is because the Phase I and II PHD <br /> will exceed with maximum supply flow rate allocated from SSJID (see Section 5), which will result in a <br /> negative storage volume unless the tanks are filled during off-demand windows from the City's distribution <br /> system. <br /> The Phase I BPS storage tanks were originally designed to provide equalization, emergency, and fire <br /> storage for Phase I across three welded steel storage tanks. At final buildout, a total of 4.6 MG of PW <br /> storage will be provided through two 1.5 MG, and one 1.6 MG welded steel tanks. The two City of Lathrop <br /> PW distribution system connections allow River Islands to initially utilize the citywide fire storage of 0.72 <br /> MG, but over time, the River Islands storage tanks need to provide their share of fire storage which the <br /> maximum storage capacity is approximately 0.60 MG (see Section 3). <br /> The 1.5 MG storage tanks will be approximately 106-feet in diameter with a height of 30-feet and maximum <br /> surface water level of 27 feet(43 feet MSL as the tank FF elevation is 16 feet). The tanks are supplied with <br /> separate inlet and outlet lines with the inlet entering just below the maximum surface water elevation. The <br /> 1.6 MG tank will have the same design parameters as the 1.5 MG tank with the exception that the tank is <br /> approximately 108-feet in diameter. <br /> 4.2.3.1.1 Hydraulic Model Assumptions—Steady State Analysis <br /> As discussed in Section 4.2.2.2, one of the methods of filling the Phase I BPS storage tanks will be from <br /> the Site A SSJID transfer pumps and the 24-inch bypass pipeline respectively. <br /> The secondary method of filling the Phase I BPS tanks will be to utilize the connection to the City's <br /> distribution system to back feed/fill the tanks during off-peak windows. A combination back pressure <br /> sustaining and solenoid shut-off valve (PSV) will be installed to connect the distribution system and the <br /> tank's outlet line. Please note that the tank's outlet is not equipped with a check valve to allow for all three <br /> tanks to be backfilled and equalize. During operator adjustable windows the combination PSV will open <br /> allowing the distribution system to fill the tanks as long as a minimum back pressure is maintained. In other <br /> words, the combination back PSV will only be allowed to fill the tanks if a minimum distribution pressure is <br /> present, the booster pumps are off, and the tank has entered a fill cycle determined by the operators. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.