River Islands Development at Lathrop January 2021 <br /> FINAL River Islands Non-Potable Water Technical Report Rev 2 #6520 <br /> Table 6-3: Minimum Preliminary Improvement Implementation Schedule <br /> Parameter 2014-2020 2020-2025 2025-2030 2030-2035 2035-2040 <br /> Firm Pumping Capacity 1,247 3,108 5,250 7,393 9,603 <br /> Requirement <br /> River Islands Installed 2,400 6,175 6,175 9,950 9,950 <br /> Firm Pumping Capacity <br /> The design for the It is estimated The second None <br /> future Phase 11 NPW that the NPW irrigation <br /> PS should start at the irrigation pump skid at <br /> beginning of the demand will the Phase 11 <br /> 2020-2025 time exceed the NPW PS <br /> period as the Main installed should be <br /> PS will be reaching capacity toward installed by <br /> its firm pumping the end of this 2030. <br /> capacity during this time period. <br /> Firm Pumping Capacity time frame. Therefore the <br /> Recommended None design of the <br /> Improvement It is estimated that future Phase 11 <br /> the NPW irrigation NPW PS <br /> demand will exceed irrigation skid <br /> the capacity of the #2 should be <br /> Main PS toward the completed and <br /> end of this time ready to be <br /> period. It is installed by <br /> recommended that 2030 <br /> one of the Phase 11 <br /> NPW PS irrigation <br /> skids be installed. <br /> 28 <br />