Laserfiche WebLink
River Islands Development at Lathrop January 2021 <br /> FINAL River Islands Non-Potable Water Technical Report Rev 2 #6520 <br /> Table 6-1: Preliminary River Islands Construction Schedule &Associated Net NPW Irrigation Area <br /> Net NPW Irrigation Area Used for NPW Irrigation (acres) <br /> NPW Irrigation Area Type 2014-2020 2020-2025 2025-2030 2030-2035 2035-2040 <br /> Drip Irrigation Systems <br /> Town Center 0.00 0.00 4.00 8.00 11.87 <br /> Commercial 0.00 0.00 12.80 25.60 39.51 <br /> Open Space - Irrigated & 21.00 31.30 47.80 64.30 77.79 <br /> Lake Edge Areas <br /> Street Landscape 4.50 10.60 20.50 30.40 66.21 <br /> Drip Irrigation Systems 25.50 41.90 85.10 128.30 195.37 <br /> Subtotal <br /> Spray Irrigation Systems <br /> Schools 30.00 72.00 82.00 92.00 100.49 <br /> Parks 8.00 42.80 98.70 154.60 193.21 <br /> Spray Irrigation Systems 38.00 114.80 180.70 246.60 293.70 <br /> Subtotal <br /> Notes: <br /> 1. Based on the River Islands Detail (Phase 1 and 2) - Final V2.0 Spreadsheet showing the preliminary <br /> construction schedule for the River Islands Development. <br /> Table 6-2: Preliminary River Islands Construction Schedule &Associated Peak Month Irrigation <br /> Demands over Daily 8-Hour Irrigation Window <br /> NPW Irrigation Area <br /> Type 2014-2020 2020-2025 2025-2030 2030-2035 2035-2040 <br /> Drip Irrigation Systems <br /> Drip Irrigation Systems <br /> PMID over 8-hour Daily 478 785 1,594 2,404 <br /> Irrigation Window <br /> (GPM) <br /> Spray Irrigation Systems <br /> Spray Irrigation Systems <br /> PMID over 8-hour Daily 769 2,323 3,656 4,989 5,943 <br /> Irrigation Window <br /> (GPM) <br /> Total PMID over 8-hour <br /> Daily Irrigation Window 1,247 3,108 5,250 7,393 9,603 <br /> (GPM) <br /> Notes: <br /> 1. Based on PMID factors multiplied by the Net NPW Irrigation Areas determined in Table 6-1. <br /> 27 <br />