Revised River Islands at Lathrop Phase 2 Project
<br /> The approved River Islands at Lathrop Project includes a mix of residential, commercial, office, recreational,
<br /> educational, and open space uses on approximately 4,905 acres on Stewart Tract and Paradise Cut. The
<br /> overall project,first approved in 2003, has been updated and amended for Phase 1 development in
<br /> particular, in 2005, 2007, 2012, 2014, 2015, and 2018. The 2012 and 2018 updates also included minor
<br /> changes to Phase 2.
<br /> The approved Phase 2 area, as contemplated in the 2003 SEIR and Lathrop General Plan, provides for the
<br /> development of a total of 6,716 residential dwelling units, a 211-acre employment center(Business Park), a
<br /> neighborhood commercial area, additional lakes, parks, golf courses, marinas, schools, an expansion of the
<br /> transportation/circulation system, and completion of the flood protection system. As part of the overall
<br /> project, River Islands would establish the biological habitat restoration/creation habitat areas and preserve
<br /> natural lands in Paradise Cut if federal and state approvals could be obtained. However, because proposed
<br /> construction of the Phase 2 area avoids delineated wetlands and waters of the U.S., completion of the urban
<br /> development of River Islands is not predicated on biological habitat restoration/creation activities.
<br /> The proposed revisions to the Phase 2 Project would densify the Phase 2 area by including additional multi-
<br /> family dwellings (condominiums, apartments, etc.) as well as more attached single-family residences similar
<br /> to units already constructed as part of Phase 1. The proposed modified development would also create a
<br /> smaller"town center" mixed-use area at Paradise Road (at the west entry to the project area) and a mixed-
<br /> use Transit Village as part of the Employment Center District that would complement the future planned
<br /> Valley Link (formerly ACE)transit station.
<br /> Other proposed Phase 2 modifications include changes in the circulation pattern from the adopted WLSP
<br /> and General Plan, with River Islands Parkway, Lakeside Drive, and Paradise Road shifting locations to the
<br /> updated land use pattern. Other land use shifts include the Old River Road District, currently part of the
<br /> Phase 1 development boundary, being included as proposed development within Phase 2. Golden Valley
<br /> Parkway would still serve its purpose as a regional alternative roadway as proposed in the current plan. An
<br /> additional arterial from the existing terminus of Golden Valley Parkway in the Employment Center would
<br /> continue into the Phase 2 area for internal circulation.
<br /> Table 1 shows the existing land use program for the Phase 2 Project, along with the proposed plan and a
<br /> comparison of the changes.
<br /> Table 1 River Islands Phase 2 Project Development Summary
<br /> Existing Phase 2 Project Proposed Phase 2 Project Difference
<br /> General Plan Designation/Land Use Non-Res. Non-Res.
<br /> 1 Dwelling 1 Dwelling Non-Res.Floor 1 Dwelling
<br /> Acres Units4 Floor Area Acres Units4 Area(s.f.) Acres Units4 Floor Area
<br /> (s.f.) (s.f.)
<br /> MU-RI Town Center(Mixed Use) 0.0 0 0 166.7 2,448 358,288 166.7 2,448 358,288
<br /> CR-RI Employment Center 125.0 0 1,800,000 86.6 0 1,477,500
<br /> (Regional Commercial) (38.4) 0 (322,500)
<br /> CN-RI Neighborhood Commercial 17.7 0 180,000 0 0 0 (17.7) 0 (180,000)
<br /> RL-RI Residential-Low 1,486.3 4,916 0 857.8 4,241 0 (628.5) (675) 0
<br /> RM-RI Residential-Medium 70.4 1,200 0 195.4 1,795 0 125 595 0
<br /> RH-RI Residential-High 34.9 600 0 11.9 260 0 (23) (340) 0
<br /> TOD-RI Transit Oriented 0.0 0 0 94.4 1,626 0 94.4 1,626 0
<br /> Development2
<br /> RCO/ Resource Conservation-Open 703.8 0 0 703.8 0 0 0.0 0 0
<br /> OS-RI Space
<br /> City of Lathrop
<br /> River Islands at Lathrop Phase 2 Project SEIR 7
<br />
|