Laserfiche WebLink
Revised River Islands at Lathrop Phase 2 Project <br /> The approved River Islands at Lathrop Project includes a mix of residential, commercial, office, recreational, <br /> educational, and open space uses on approximately 4,905 acres on Stewart Tract and Paradise Cut. The <br /> overall project,first approved in 2003, has been updated and amended for Phase 1 development in <br /> particular, in 2005, 2007, 2012, 2014, 2015, and 2018. The 2012 and 2018 updates also included minor <br /> changes to Phase 2. <br /> The approved Phase 2 area, as contemplated in the 2003 SEIR and Lathrop General Plan, provides for the <br /> development of a total of 6,716 residential dwelling units, a 211-acre employment center(Business Park), a <br /> neighborhood commercial area, additional lakes, parks, golf courses, marinas, schools, an expansion of the <br /> transportation/circulation system, and completion of the flood protection system. As part of the overall <br /> project, River Islands would establish the biological habitat restoration/creation habitat areas and preserve <br /> natural lands in Paradise Cut if federal and state approvals could be obtained. However, because proposed <br /> construction of the Phase 2 area avoids delineated wetlands and waters of the U.S., completion of the urban <br /> development of River Islands is not predicated on biological habitat restoration/creation activities. <br /> The proposed revisions to the Phase 2 Project would densify the Phase 2 area by including additional multi- <br /> family dwellings (condominiums, apartments, etc.) as well as more attached single-family residences similar <br /> to units already constructed as part of Phase 1. The proposed modified development would also create a <br /> smaller"town center" mixed-use area at Paradise Road (at the west entry to the project area) and a mixed- <br /> use Transit Village as part of the Employment Center District that would complement the future planned <br /> Valley Link (formerly ACE)transit station. <br /> Other proposed Phase 2 modifications include changes in the circulation pattern from the adopted WLSP <br /> and General Plan, with River Islands Parkway, Lakeside Drive, and Paradise Road shifting locations to the <br /> updated land use pattern. Other land use shifts include the Old River Road District, currently part of the <br /> Phase 1 development boundary, being included as proposed development within Phase 2. Golden Valley <br /> Parkway would still serve its purpose as a regional alternative roadway as proposed in the current plan. An <br /> additional arterial from the existing terminus of Golden Valley Parkway in the Employment Center would <br /> continue into the Phase 2 area for internal circulation. <br /> Table 1 shows the existing land use program for the Phase 2 Project, along with the proposed plan and a <br /> comparison of the changes. <br /> Table 1 River Islands Phase 2 Project Development Summary <br /> Existing Phase 2 Project Proposed Phase 2 Project Difference <br /> General Plan Designation/Land Use Non-Res. Non-Res. <br /> 1 Dwelling 1 Dwelling Non-Res.Floor 1 Dwelling <br /> Acres Units4 Floor Area Acres Units4 Area(s.f.) Acres Units4 Floor Area <br /> (s.f.) (s.f.) <br /> MU-RI Town Center(Mixed Use) 0.0 0 0 166.7 2,448 358,288 166.7 2,448 358,288 <br /> CR-RI Employment Center 125.0 0 1,800,000 86.6 0 1,477,500 <br /> (Regional Commercial) (38.4) 0 (322,500) <br /> CN-RI Neighborhood Commercial 17.7 0 180,000 0 0 0 (17.7) 0 (180,000) <br /> RL-RI Residential-Low 1,486.3 4,916 0 857.8 4,241 0 (628.5) (675) 0 <br /> RM-RI Residential-Medium 70.4 1,200 0 195.4 1,795 0 125 595 0 <br /> RH-RI Residential-High 34.9 600 0 11.9 260 0 (23) (340) 0 <br /> TOD-RI Transit Oriented 0.0 0 0 94.4 1,626 0 94.4 1,626 0 <br /> Development2 <br /> RCO/ Resource Conservation-Open 703.8 0 0 703.8 0 0 0.0 0 0 <br /> OS-RI Space <br /> City of Lathrop <br /> River Islands at Lathrop Phase 2 Project SEIR 7 <br />