My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WOODARD <br /> &CURRAN <br /> Table 8: Current and Projected Non-Potable Water Supply (2020-2040) <br /> Current and Projected Su I AFY <br /> Supply Type Level of 2015 2020 2025 2030 2035 2040 <br /> Pp Y yp Treatment (Existing) <br /> Recycled Water' Tertiary 429 1,159 2,103 3,061 3,775 4,479 <br /> Other Non-Potable Sources2 Chlorination 0 153 367 617 869 1,121 <br /> Source:City of Lathrop 2015 UWMP,Table 6-4(EKI,2017) <br /> Notes: <br /> 1. Recycled water supplies will be supplemented by the River Islands development if needed. <br /> 2. River Islands will have the ability to supplement City recycled water supplies with lake and river water.These supplemental sources can be <br /> used to meet up to 100%of River Islands non-potable demands if recycled water supplies are unavailable. <br /> 2.3 Water Supply Reliability <br /> Various conditions may influence the reliability of the City's water supplies in the future.The following sections evaluate <br /> the reliability of the City's supplies, including SSJID entitlements and local groundwater yield through 2040, and <br /> discusses potential constraints on these supplies. <br /> 2.3.1 SSJID Water Reliability <br /> Various conditions may influence total water supply available to SSJID.This section describes the water rights held by <br /> SSJID and the City's entitlement to the SSJID supply. <br /> As discussed in Section 2.1.1, the 1995 Water Supply Development Agreement provides the contractual relationship <br /> between SSJID and the City and includes specific rates of delivery and maximum amounts of water that SSJID is <br /> obligated to supply to the City. Due to the seniority of the water rights underlying the SCWSP, SSJID's pre-1914 <br /> appropriative rights to Stanislaus River water, the City has historically assigned a high reliability to SCWSP water. <br /> However, the recent drought has caused the City to revise its reliability projections for SCWSP water in dry years. In <br /> August 2014, due to concerns about decreasing water levels in the New Melones Reservoir, SSJID curtailed water <br /> deliveries to the SCWSP contracting cities to 80 percent of their monthly allocations. This 20 percent curtailment <br /> translated into an allocation to the City of approximately 85 percent of its annual contractual entitlement in 2014. In <br /> 2015, SSJID allocated water to each SCWSP contracting city based upon actual water use in 2013. Under this <br /> allocation scheme,the City was assigned 85 percent of its actual water use in 2013. In both 2014 and 2015, however, <br /> the City purchased less than its dry year allocation and instead relied primarily on groundwater. <br /> Given the inconsistency in SCWSP allocation in recent years and the uncertainty regarding dry year allocation in the <br /> future,the City has relied upon the dry year allocation adopted by SSJID in its 2015 UWMP(Provost&Pritchard,2016), <br /> which assumes a proportionate reduction in deliveries to urban and agricultural users. The projected urban and <br /> agricultural demands presented in SSJID's 2015 UWMP are summarized in Table 9. The urban demand is assumed <br /> to be equal to the SCWSP Phase I contract amount(31,552 AFY).Agricultural demands within the SSJID service area <br /> are projected to decrease gradually as irrigation practices become more efficient. <br /> Table 9: SCWSP Projected Water Demands <br /> Estimated Demand AFY <br /> 2020 2025 2030 2035 <br /> Contracted Urban Demand 31,552 31,552 31,552 31,552 <br /> Projected Agricultural Demand 274,100 271,800 269,500 267,200 <br /> Total 1 305,652 303,352 301,052 298,752 <br /> Source:City of Lathrop 2019 WSMP,Table 5-5(EKI,2019) <br /> Califia(0011533.00) 24 Woodard&Curran, Inc. <br /> River Islands Phase 2 Development Water Supply Assessment September 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.