Laserfiche WebLink
Califia LLC River Islands Phase 2 <br /> 5044.000.008 Phase I Environmental Site Assessment <br /> 1.0 INTRODUCTION <br /> 1.1 SITE LOCATION AND DESCRIPTION <br /> ENGEO conducted a phase I environmental site assessment for the Property located along West <br /> Stewart Road and Paradise Road in Lathrop, California (Figures 1 and 2). The approximately <br /> 2,800-acre Property is identified as the following APNs (Figure 3): <br /> 0 210-040-01, 210-040-02, 210-040-03, 210-040-04 <br /> • 210-400-16 <br /> 0 213-110-01, 213-110-02, 213-110-03 <br /> 0 213-120-01, 213-120-03, 213-120-04, 213-120-05 <br /> 0 213-130-01, 213-130-02, 213-130-05, 213-130-06, 213-130-07 <br /> • 213-210-02, 213-210-03, 213-210-04, 213-210-05, 213-210-06, 213-210-07 <br /> 0 213-220-04, 213-220-05, 213-220-06 <br /> 0 213-250-01, 213-250-02, 213-250-03, 213-250-04 <br /> 1.2 CURRENT USE OF PROPERTY AND ADJOINING PROPERTIES <br /> The overall River Islands Project is located on Stewart Tract in the southwestern portion of <br /> Lathrop, north of the 1-205 and 1-5 interchange(Figure 1). The Phase 2 development plan consists <br /> of approximately 2,125 acres of planned development and an additional approximately <br /> 675 additional acres of planned open space within Paradise Cut, and is situated west of the <br /> interior levees bordering the Phase 1 portion of the project, south of the Old River, northeast of <br /> Paradise Cut, and north of the Union Pacific Railroad right-of-way. The majority of the Phase 2 <br /> area is currently used for agricultural purposes, including annual row crops such as corn, alfalfa, <br /> pumpkins, and other seasonally harvested crops. Paradise Road and West Stewart Road cross <br /> through the Property, along with several agricultural roads. There are several structures on the <br /> Property, including three residential structures, several barns and sheds, and stalls associated <br /> with an existing horse ranch. <br /> In addition, Phase 2 includes approximately 700 additional acres of agricultural land located within <br /> Paradise Cut. It is our understanding that this land has been designated for agricultural use and <br /> is not planned for future development. <br /> The majority of the Phase 2 area is surrounded by United States Army Corps of Engineers <br /> (USACE) levees along Old River and Paradise Cut, and new levees have been constructed to <br /> their interior. Construction of the new Phase 2 levees began in June 2019 with the excavation of <br /> the inspection trench along the entire levee alignment. Construction of the levee prism also began <br /> in June 2019, and levee construction was completed in November 2019. At the time of this report, <br /> development improvements to the interior portions of Phase 2 have not begun, which will likely <br /> include the installation of underground utilities, construction of sidewalks and streets, and general <br /> grading for future residential and commercial development. We also understand that future <br /> construction will include medium- to high-density multi-family structures, mixed-use commercial <br /> development, community parks and associated recreational facilities, as well as future schools. <br /> Site-specific geotechnical studies may be required for the design of these aspects of the project. <br /> Land uses on adjoining properties include Old River to the north, agricultural fields to the west <br /> and south, and the rest of the River Islands development to the northeast. <br /> ENGEO March 12, 2020 <br /> Expect Excellence- <br />