Laserfiche WebLink
Califia LLC River Islands Phase 2 <br /> 5044.000.008 Phase I Environmental Site Assessment <br /> • Interviews with owners/occupants and public sector officials. <br /> • Preparation of this report with our findings, opinions, and conclusions. <br /> 5.3 SIGNIFICANT ASSUMPTIONS OR DEVIATIONS FROM ASTM STANDARD <br /> PRACTICE <br /> The data gaps identified during this process do not affect the conclusions as to the presence or <br /> lack of presence of RECs at the Property. We identified the following data gaps during our <br /> investigation: <br /> • We did not observe the interior of the structures at 3637 West Stewart Road. <br /> 5.4 LIMITATIONS AND EXCEPTIONS OF ASSESSMENT <br /> The professional staff at ENGEO strives to perform its services in a proper and professional <br /> manner with reasonable care and competence but is not infallible. The recommendations and <br /> conclusions presented in this report were based on the findings of our study, which were <br /> developed solely from the contracted services. The findings of the report are based in part on <br /> contracted database research, out-of-house reports, and personal communications. The opinions <br /> formed by ENGEO are based on the assumed accuracy of the relied upon data in conjunction <br /> with our relevant professional experience related to such data interpretation. ENGEO assumes <br /> no liability for the validity of the materials relied upon in the preparation of this report. <br /> This document must not be subject to unauthorized reuse; that is, reuse without written <br /> authorization of ENGEO. Such authorization is essential because it requires ENGEO to evaluate <br /> the document's applicability given new circumstances, not the least of which is passage of time. <br /> The findings from a phase I environmental site assessment are valid for one year after completion <br /> of the report. Updates of portions of the assessment may be necessary after a period of 180 days <br /> after completion. <br /> This phase I environmental site assessment is not intended to represent a complete soil, soil gas, <br /> or groundwater characterization, nor define the depth or extent of soil, soil gas, or groundwater <br /> contamination. It is intended to provide an evaluation of potential environmental concerns <br /> associated with the use of the Property. A more extensive assessment that would include a <br /> subsurface exploration with laboratory testing of soil, soil gas, and groundwater samples could <br /> provide more definitive information concerning site-specific conditions. If additional assessment <br /> activities are considered for the Property and if other entities are retained to provide such services, <br /> ENGEO cannot be held responsible for any and all claims arising from or resulting from the <br /> performance of such services by other persons or entities. ENGEO can also not be held <br /> responsible from any and all claims arising or resulting from clarifications, adjustments, <br /> modifications, discrepancies or other changes necessary to reflect changed field or other <br /> conditions. <br /> 5.5 SPECIAL TERMS AND CONDITIONS <br /> ENGEO has prepared this report for the exclusive use of our client, Califia LLC. It is recognized <br /> and agreed that ENGEO has assumed responsibility only for undertaking the study for the Client. <br /> The responsibility for disclosures or reports to a third party and for remedial or mitigative action <br /> shall be solely that of the Client. <br /> ENGEO Page 112 March 12, 2020 <br /> Expect Excellence- <br />