My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Assorted screwdrivers (flat blade-one must be 1/8" wide and Phillips) <br /> ❑ 5/8" copper tube bending tool <br /> ❑ 5/8" copper tube flaring tool <br /> ❑ Copper tubing cutter <br /> ❑ Electrical multi-Deter <br /> ❑ Small hand brush (1-1/2" thick, for clearing chips) <br /> ❑ 12" adjustable wrench <br /> ❑ 10" pipe wrench <br /> ❑ Tape measure <br /> ❑ Allen wrenches <br /> 6. DISPENSER ACCESS: <br /> ❑ Secure Dispenser Access keys from Station Management. <br /> ❑ Lock-out and tag-out all electrical power to dispenser being modified. <br /> ❑ Remove both lower dress panels. <br /> ❑ Remove side skin on the left side as viewed from the `A side (`J' box). This is the side <br /> where the 1" balance vapor pipe is installed. <br /> ❑ Open both upper doors to the electronics compartment. <br /> 7. SURVEY— Scope of Work: Perform this step before beginning steps 8 thru 10. <br /> Read and familiarize yourself with the theory of operations sheet and wiring instructions for <br /> the VP1000 Vapor Pump. The installation of the pump is accomplished by rotating the motor <br /> mounting bracket bolting it to the dispenser frame on the same side as the electrical `J' box <br /> in the free space on the left hand side, see photos E & F. From this survey, you will have an <br /> indication of where the vapor plumbing fittings need to go and where the electrical conduits <br /> need to be routed. The Healy potted conduit nipple is installed in the vapor barrier above the <br /> meters, in a 1 1/8" hole that is already available but is plugged. See Photo K and Section 9. <br /> CAUTION: ALL POWER TO DISPENSER UNDER MODIFICATION SHOULD BE <br /> COMPLETELY DISCONNECTED AND CAPPED OFF AT JUNCTION BOX TO AVOID <br /> UNINTENTIONAL FEEDBACK FROM OTHER DISPENSERS!! <br /> 8-5 <br /> CARO Approved IOM 8-Wayne Vista Series-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.