My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Install the male half of the electrical union to the pull elbow. Run wires through the pull <br /> elbow and into the "J" box. Connect the union half's together being careful not to pinch <br /> wires, reinstall the pull elbow cover and tighten the nut on the potted nipple. <br /> ❑ At the `J' box, cut all the wires leaving at least 6" on each piece. Strip all wires about 1/2" <br /> and join the wires color for color, using wire nuts supplied. Coil all wires and place into box, <br /> replace the cover. <br /> EPP <br /> IF <br /> j-� <br /> Photo N Photo O <br /> 10. WIRING THE ELECTRONICS <br /> ❑ Place the module loosely in the area for mounting, see photo P. Dress the harness wires <br /> from the module under the partition and up to the valves board in the center compartment, <br /> see photos P & Q. <br /> ❑ Connect the wires from the sealed nipple to the interface module as follows: <br /> ■ Black wire to `motor ` on module <br /> ■ White wire to `neutral' on module <br /> ■ Red wire (either) to `output Von module <br /> ■ Red wire (other) to `output 2' on module <br /> ■ Orange wire to `fault common' on module <br /> ■ Purple wire to `fault input' on module <br /> ■ Green wire needs a #8 ring tong lug (provided) installed and connected to any chassis <br /> ground (frame) <br /> ❑ Locate the harness cable from the module and bring up to the valves board. Disconnect <br /> the existing valve wire connector in the board (J3 connector, labeled Solenoid Valves) and <br /> plug it into the harness male connector. Plug the original female connector into the male <br /> connector on the harness, see photo Q. <br /> ❑ Mount the module as shown in photo R, using the 8-32 x 3/4" screw and nut supplied in the <br /> electrical kit. There is an existing hole in the chassis that is the right size and in the right <br /> place for the screw. <br /> ❑ Locate the black and white twisted pair wire from the module with a connector and plug into <br /> any vacant receptacle on the power distribution board (CM301) located at the center of the <br /> front frame rail. <br /> 8-s <br /> CARO Approved IOM 8-Wayne Vista Series-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.