My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Take the above assembly and feed over the pump motor so the flare elbow protrudes <br /> through hole in the side frame and assemble the union collar to hold the assembly in <br /> place on the motor. Completely tighten the union collar positioning the assembly as <br /> shown in photos I & J. <br /> ❑ Install a 1/2" x 5/8" flare elbow into the outlet of the VAC pump and tighten to face either <br /> the vapor tee mounted on the dispenser frame if available or the 1" vapor riser. <br /> ❑ Measure, cut, install flare nuts and flare a piece of 5/8" OD copper tube to fit between <br /> the flare fitting in the top vapor manifold and the flare elbow assembly just installed, see <br /> photo K. <br /> 9. INSTALLING THE SEALED NIPPLE ASSEMBLY: <br /> ❑ In the extreme left corner, "A" (J box) side of the vapor barrier there is a sealed knockout, <br /> (may be obscured by a plastic rain tray). Remove the bolt, nut and washer assembly to <br /> open the hole. <br /> ❑ Install the 1346 sealed nipple assembly by removing the first nut and washer, turn the other <br /> nut up fully on the threads and feed the wires down from the top of the vapor barrier to the <br /> hydraulics area, see photo L. Re-install the washer and nut over the wires and turn onto <br /> the first couple of threads leaving the nipple loose at this time. <br /> ❑ Get a 1/2" x 7" conduit nipple and install the female half of the electrical union on one <br /> end and a 3/4" x 1/2" reducer on the other end. To the reducer, attach the 3/4" electrical <br /> coupling. Install this assembly to the sealed nipple, see photo M. NOTE: Electrical fittings <br /> must be installed with a minimum of five threads. <br /> Photo L Photo M <br /> ❑ On the pump motor, install a 1/2" x 7" conduit nipple, a 1/2" electrical coupling and a <br /> 1/2" x 4-1/2" nipple, see photo N. <br /> ❑ Get the electrical "J" box, remove the cover and install a 3/4" x 1/2" reducer bushing into <br /> each hub. Install the "J" onto the 4-1/2" nipple positioned as shown in photo N. <br /> ❑ Install a 1/2" electrical close nipple to "J" box followed by the pull elbow, see photo O. <br /> Remove the pull elbow cover. <br /> s-s <br /> CARR Approved IOM 8-Wayne Vista Series-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.