My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 2 <br /> Typical Liquid Condensate Trap Installed Inside the Transition Sump <br /> RISER w/LIQUID SENSOR Must use a Reducer on 3"Risers <br /> PRODUCT PIPING SUCTION RISER with Fittings/Components per <br /> MONITORING RISER Exhibit 1 in the Executive Order <br /> FUEL ENTRY POINT A °` <br /> 4 � <br /> BRAIDED SS HOSE OR Y4' <br /> COPPER TUBING TO <br /> VAPOR LINE TURBINE PUMP <br /> (SLOPE Y8"PER <br /> FOOT MIN.) FRP CONTAINMENT PIPE <br /> VAPOR LINE -� <br /> (SLOPE YB" PER FOOT <br /> MIN.) <br /> TRANSITION SUMP <br /> LIQUID SENSOR <br /> LIQUID <br /> CONDENSATE ALUMINUM/STAINLESS STEEL INSECT SCREEN <br /> TRAP LIQUID SENSOR w/STAINLESS STEEL CLAMP <br /> Note: A Liquid Condensate Trap installed inside a liquid AND vapor tight transition sump that is moni- <br /> tored with a liquid sensor can be single walled (if installed before July 1, 2004). <br /> Figure 3 <br /> Typical Layout of a Liquid Condensate Trap Installed in a UST System <br /> Installed On or after July 1, 2004 and after the Installation of the <br /> Equipment Listed in Exhibit 1 of Executive Orders VR 201 and VR 202 <br /> Design and Construction Requirements for UST Systems <br /> Installed on or after July 1, 2004 <br /> INCON TSP-K2A RISER CAP&ADAPTER <br /> Must use a Reducer on 3"Risers <br /> RISER wl LIQUID SENSOR SUCTION TUBE RISER with Fittings/Components per <br /> Exhibit 1 in the Executive Order <br /> FUEL ENTRY POINT <br /> d n <br /> Braided SS Hose or Y4"Copper Tubing to <br /> Turbine Pump DW FRP Secondary Containment <br /> VAPOR LINE-DW FRP Continuously Monitored <br /> Secondary Containment <br /> Continuously Monitored <br /> (Slope Ys Per Foot Min.) <br /> VAPOR LINE-DW FRP <br /> Secondary Containment <br /> Continuously Monitored <br /> (Slope YB'Per Foot Min.) <br /> TRANSITION SUMP <br /> UL Approved Double Wall must be Continuously Monitored <br /> LIQUID LIQUID SENSOR <br /> CONDENSATE Aluminum or Stainless Steel Insect Screen <br /> TRAP LIQUID SENSOR w/Stainless Steel Clamp <br /> The UST System must be designed and constructed with a continuous monitoring system capable of(1)detecting <br /> entry of the liquid or vapor-phase of the substance stored in the primary containment into the secondary containment <br /> and(2)detecting water intrusion into the secondary containment. H&S Code Chapter 6.7 Section 25290.1 <br /> 9-5 <br /> CARH Approved IOM 9-Liquid Condensate Trap-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.