Laserfiche WebLink
4.4 Installation of Suction Tube Riser, Suction Tube and Screen <br /> For all installations you must use fuel rated pipe sealant on all threaded connections. <br /> For new installations cut to size and thread a 2 inch galvanized steel riser for the suction tube <br /> and install it into a 2 inch bung at the top of the Liquid Condensate Trap. <br /> For all installations install a 2 inch Tee fitting for the Fuel Entry Point on top of the 2 inch gal- <br /> vanized steel riser. <br /> Measure the length of the suction tube to ensure it can meet the distance requirement in <br /> Figure 7. Cut the suction tube to length. When installing the suction tube, ensure the bottom <br /> of the suction tube is no more than 1 inch to 1 '/2 inches from the bottom of the Liquid <br /> Condensate Trap. <br /> Cut a piece of 4 inch by 4 inch piece of screen material, either 18 x 14 aluminum mesh or <br /> 18 x 18 stainless steel mesh. Wrap it around the end of the suction tube as shown in Figure 7, <br /> leaving approximately 1 inch of screen below the end of the suction tube. Tighten the stainless <br /> steel hose clamp around the screen securing it approximately 3/8 inch or more from the bottom <br /> of the suction tube. <br /> Once the aluminum screen is installed, the suction tube is ready to screw into the bottom of a <br /> double-tap bushing. <br /> This double tap bushing, with the suction tube, is then installed into the top of the tee fitting. <br /> Connect the suction line to the top of the double tap bushing using appropriate fittings <br /> (Figures 8 thru 8c) and the other end of the suction line connects to the 140 micron in line filter <br /> installed at the turbine syphon port per section 4.1 (Figures 4a and 4b). <br /> Figure 7 <br /> Aluminum Screen and Suction Tube Installation <br /> Suction Tube <br /> Aluminum Screen <br /> iLLLL S.S.Hose Clamp <br /> End of Suction Tube <br /> 1" <br /> Bottom of Liquid <br /> D" -112.. Condensate Trap <br /> 9-II <br /> CARE Approved IOM 9-Liquid Condensate Trap-Executive Orders VR-201 and VR-202 <br />