My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> DiagnosticMenus........................................................................................................44 <br /> Appendix A: Site EVR/ISD Equipment Location Worksheet <br /> Figures <br /> Figure 1. Example Site Diagram ...........................................................................5 <br /> Figure 2. TLS Console Interface Module Bays .....................................................7 <br /> Figure 3. Smart Sensor Setup ............................................................................ 10 <br /> Figure 4. Smart Sensor Setup Printout Example ................................................ 11 <br /> Figure5. EVR/ISD Setup 1 ................................................................................. 12 <br /> Figure6. EVR/ISD Setup 2 ................................................................................. 13 <br /> Figure 7. EVR/ISD Setup 3 ................................................................................. 14 <br /> Figure 8. Example Healy Setup Printout ............................................................. 15 <br /> Figure 9. Site Tank Control Examples ................................................................ 16 <br /> Figure 10. Dispenser Control Examples ............................................................... 17 <br /> Figure 11. Assigning ISD Shut Down Alarms in Line Leak Disable Setup ............ 18 <br /> Figure 12. Example Line leak Disable Setup Printout ........................................... 19 <br /> Figure 13. Assigning ISD Shut Down Alarms in Output Relay Setup ...................20 <br /> Figure 14. Example Printout- ISD Alarms Assignments-Output Relay Setup.......21 <br /> Figure 15. Assigning ISD Shut Down Alarms in Dispenser Relay Setup ..............22 <br /> Figure 16. Example Printout- ISD Hose Alarm Assignments- <br /> Dispenser Relay Setup ........................................................................23 <br /> Figure 17. TLS Console Alarm Interface ...............................................................25 <br /> Figure 18. Example Warning Posting ...................................................................26 <br /> Figure 19. Example Alarm Posting .......................................................................26 <br /> Figure 20. ISD Alarm Override Procedure ............................................................27 <br /> Figure 21. Printing ISD Reports on Console Printer .............................................31 <br /> Figure 22. ISD Status Report Example-TLS Console Printout ...........................32 <br /> Figure 23. ISD Daily Report Example-TLS Console Printout ..............................33 <br /> Figure 24. ISD Monthly Report Example-TLS Console Printout ......................... 34 <br /> Figure 25. Connecting Laptop to TLS Console for Serial Communication ........... 35 <br /> Figure 26. Connection Description Window ..........................................................36 <br /> Figure 27. Connect to Window ..............................................................................37 <br /> Figure 28. Console Comm Port Settings Printout Example ..................................38 <br /> Figure 29. HyperTerminal Main Window ...............................................................39 <br /> Figure 30. ISD Daily Report Details-Serial to PC Format ...................................41 <br /> Figure 31. ISD Monthly Status Report-Serial to PC Format ...............................42 <br /> Figure 32. ISD Alarm Status Report-Serial to PC Format ...................................43 <br /> Tables <br /> Table 1. V-R Supported Vapor Recovery Systems ................................................2 <br /> Table 2. Related Manuals ......................................................................................2 <br /> Table 3. SD Alarm Summary ................................................................................28 <br /> Table4. Other Alarms ..........................................................................................29 <br /> Table 5. Wireless Related Sensor Alarms ............................................................29 <br /> Table 6. Serial Commands for ISD Alarm, Monthly, and Daily Reports ...............40 <br /> Table 7. Clear Test Repair Menu .........................................................................47 <br /> 10-vi <br /> GARB Approved IBM 10 -Veeder Root ISO Install,Setup,9 Operation Manual-Executive Order VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.