My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br /> In-Station Diagnostic (ISD) equipment is designed to monitor the collection and containment of vapors by vapor <br /> recovery equipment. Using the existing Veeder-Root (V-R) TLS console platform, sensor inputs an dispenser fuel <br /> meter inputs,the ISD software continuously monitors the vapor recovery equipment, maintains test records, <br /> provides test reports, generates alarms following test/equipment failures, and finally, shuts down the site upon the <br /> occurrence of designated alarms. <br /> This manual provides instructions to install, setup, and operate the special components of the Veeder-Root ISD <br /> system that are not covered in existing documentation shipped with other non-ISD specific V-R equipment (e.g., <br /> Mag probes, line leak detection, etc.).The ISD feature is an option for the TLS console platform, and as such, <br /> many of the installation/setup/operation instructions for non-ISD specific tasks (e.g., line leak detection) are <br /> covered in TLS-3XX supplied literature. <br /> WARNING! Revision or reprogramming of the TLS may require notification of the local Certified <br /> Unified Program Agency(COPA). <br /> Site Requirements <br /> Below are the requirements for all vapor recovery systems except where noted. <br /> • V-R TLS-350R/EMC w/BIR,TLS-350 Plus/EMC Enhanced,TLS-350/EMC and Red Jacket ProMax consoles <br /> with ECPUII - install as per TLS-3XX Site Prep manual, setup following instructions in TLS-3XX System Setup <br /> Manual. <br /> • A flash memory board (NVMEM2) for ISD software storage- installed on the ECPUII board in place of the <br /> console's 1/2 Meg RAM board - install as per TLS-350 Series Board and Software Replacement Manual, no <br /> setup required. <br /> • A RS-232 module is required for RS-232 access to ISD reports - install as per instructions shipped with <br /> module, setup following instructions in this manual. <br /> • An output relay or dispenser relay board is required (either 4-Output Relay module, 1/0 Combination module) to <br /> shut down each Submersible Turbine Pump (STP) or dispenser upon activation of certain ISD alarms (these <br /> alarms can also be assigned in Line Leak Disable setup to shut down the STP or dispenser if Line Leak <br /> detection feature is installed) - install as per instructions shipped with module or line leak system, setup ISD <br /> shut down alarms either using output relays or line leak system following instructions in this manual. <br /> • Dispenser Interface module (DIM) for the type of dispensers installed - install as per installation manual shipped <br /> with device, setup following instructions in DIM manual and TLS-3XX Setup Manual. Note:the DIM supplies <br /> flow meter event inputs needed for ISD analysis. <br /> • One V-R Mag probe in each of the gasoline tanks being monitored - install as per installation manual shipped <br /> with device, setup following instructions in TLS-3XX Setup Manual. <br /> • Smart Sensor module is required to monitor Vapor Flow Meters and Vapor Pressure Sensor (up to 8 devices <br /> per module, or 7 if customer is using Smart Sensor module/embedded pressure). Install and connect following <br /> instructions in the Vapor Flow Meter and Vapor Pressure Sensor installation Guides. <br /> • Vapor Flow Meters (one for each dispenser) - install as per ISD Flow Meter installation manual shipped with <br /> meter, setup following instructions in this manual. <br /> • Vapor Pressure Sensor (one per site) - install as per ISD Pressure Sensor installation manual shipped with <br /> sensor, setup following instructions in this manual. <br /> • To achieve CP-201 false alarm performance standards for ISD reporting,the vapor recovery system leak rate <br /> should be at or below 2.88 CFH at 2 inches water column. <br /> 10-1 <br /> CARO Approved IOM 10 -Veeder Root ISO Install,Setup,5 Operation Manual-Executive Order VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.