My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction Supported Vapor Recovery Systems <br /> Supported Vapor Recovery Systems <br /> Table 1 lists V-R supported vapor recovery systems. <br /> Table 1.V-R Supported Vapor Recovery Systems <br /> Name CARB Executive Order <br /> Healy Assist EVR VR-202 <br /> Contractor Certification Requirements <br /> Veeder-Root Contractor Installer ATG Technician VR Vapor Products <br /> Certification Requirements Certification6 Certification? Certification$ <br /> Installs ISD X X X <br /> Install PMC X X X <br /> Install CCVP X X X <br /> Install Wireless ISD/PMC X X X <br /> Installation Checkout2 X X <br /> ATG Startup3/Training4/Services X X <br /> ISD Startup/Training/Service X <br /> PMC Startup/Training/Service X <br /> CCVP Startup/Training/Service X <br /> Wireless ISD/PMC Startup/Training/Service <br /> Install Pressure Sensor(ATG) X X X <br /> Maintain Pressure Sensor(ATG) X X <br /> Calibrate Pressure Sensor(ATG) X X <br /> Clear ATG Pressure Sensor Alarm(ATG) X X <br /> Clear ISD/PMC Alarms(ISD/PMC) X <br /> iPerform wiring and conduit touting;equipment mounting GUST Monitoring Systems—Installer(Level 1) <br /> 21nspect wiring and conduit routing;equipment mounting ?Certified UST Monitoring Technician <br /> 3Turn power on,program and test the systems $VR Vapor Products <br /> 4Provide supervised field experience in service techniques and operations <br /> STroubleshoot and provide routing maintenance <br /> Warranty Registrations may only be submitted by selected Distributors. Certified installers are required to pro- <br /> vide the GDF operator with the completed Equipment Warranty Notice,form 577013-868, for their records. <br /> Related Manuals <br /> The manuals in Table 2 below are shipped with the equipment on the V-R Tech Docs CD-ROM and will be needed <br /> to install non-ISD specific equipment. <br /> Table 2. Related Manuals <br /> V-R Manual Part Number <br /> TLS-3XX Site Prep Manual VR202 IOM 21 <br /> ISD Flow Meter Installation Guide VR202 IOM 22 <br /> ISD Vapor Pressure Sensor Installation Guide 577013-797 <br /> TLS-3XX Series Consoles System Setup Manual 576013-623 <br /> IB-2 <br /> GARB Approved IBM 10 -Veeder Root ISO Install,Setup,9 Operation Manual-Executive Order VR-262 <br />
The URL can be used to link to this page
Your browser does not support the video tag.