My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Setup Hose labetlFueling Point/Air Flow Meter Serial Number Chart <br /> SMARTSENSOR SETUP <br /> ---------------------- <br /> S01 :FP 1 — 2 <br /> CATEGORY AIR FLOW METER <br /> S02 :VAPOR PRESSURE <br /> CATEGORY VAPOR PRESSURE <br /> i sd-ev r\ss s etp rt.e p s <br /> Figure 4. Smart Sensor Setup Printout Example <br /> Hose label/Fueling Point/Air Flow Meter Serial Number Chart <br /> The next step in programming your system requires documentation of information from the ISD equipment installed <br /> at the facility. Choose the appropriate data sheet from Appendix A for the vapor recovery system installed at your <br /> facility. Record the unique information from the sensors prior to attampting the TLS EVR/ISD set up described in <br /> Figure 6. After you complete the TLS EVR/ISD you must perform the Product Meter ID set up procedure to <br /> complete the set up <br /> EVR/ISD Setup <br /> Figure 5, Figure 6, and Figure 7 diagram the EVR/ISD setup programming. Start with the first figure, continue to <br /> the second, and finish in the third. Figure 8 shows an example printout of the EVR/ISD setup. <br /> ID-11 <br /> GARB Approved IDM 10 -Veeder Root ISD Install,Setup,9 Operation Manual-Executive Order VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.