My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Setup Smart Sensor Setup <br /> Smart Sensor Setup <br /> The Smart Sensor Interface Module is installed in the Intrinsically-Safe bay of the TLS console.This module <br /> monitors Air Flow Meters and the Vapor Pressure Sensor. Figure 3 diagrams the Smart Sensor setup procedure. <br /> Figure 4 shows a printout of the Smart Sensor setup. <br /> 7-7 <br /> —� <br /> I I I <br /> I. Change <br /> I I FE Enter <br /> �F Function <br /> © Prints out a cop of the <br /> Smartsensor Setup entries. FM Mode <br /> See a ample in Figure -2. <br /> [P Print <br /> F$ Step <br /> SS CONFIG-MODULE 1 Press once and the Press once and the Press once and the 2nd Tank/Sensor <br /> first position blinks, —>• —� X changes to a 2.Continue El <br /> SLOT X-X X X X X X X X press again and the second position blinks � pressing the—>and Change <br /> X changes to a 1. buttons until all attached 7 Repress until <br /> The first of the Installed SS modules sensors are enabled for V desired message <br /> appears In this display.To view another module 1(up to 6). appears in display <br /> installed SS module,press theTank/Sensorbutt01 <br /> 2 Key press <br /> sequence <br /> Press this button and enter a label for this <br /> a SS CONFIG-MODULE 2 ENTER SMARTSENSOR LABEL © sensor,e.g.FP1,2 AFM. <br /> SLOT X-X X X X X X X X —' s1: <br /> When you have enabled The second of the installed SS modules <br /> all of the sensors attached appears in the display.Follow the button <br /> to this SS module,press pressing sequence described for SS module 1 <br /> the Enter button to accept to enable all sensors attached to module 2. Select the next sensor. <br /> your choices. Repeat these steps to enable all sensors attached and assign a label and <br /> to all SS modules. <br /> category as shown <br /> above.Repeat this <br /> sequence for all of the <br /> installed sensors. <br /> E $ Si:SELECT SS CATEGORY © Press this button and select type. —. E $ <br /> UNKNOWN Note:User can only change assignment <br /> Select sensor category if device has not identified itself.If actual isd- tsps tup.ep. <br /> (e.g.,Air Flow Meter) device disagrees with assigned type,an <br /> Equipment Configuration Alarm is <br /> posted. <br /> Figure 3. Smart Sensor Setup <br /> m-m <br /> GARB Approved IDM 10 Veeder Root ISD Install,Setup,E Operation Manual-Executive Order VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.