My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pressure Sensor Installation Tools Required <br /> MR F-1 <br /> L <br /> _.Y, ,�-�rtik,.., �• � `�1 ti �'.P i 'mss r� - <br /> a j # t <br /> S <br /> Figure 1. Table 2 Component Pictorial <br /> Tools Required <br /> 1. Wrenches suitable for tightening tubing/pipe fittings. <br /> 2. Necessary pipe fitter's equipment (including threading equipment as needed) and a non-hazardous work <br /> space suitable to modify the dispenser vapor line or the vapor vent stack for Pressure Sensor installation. <br /> 3. Torx bit for tamper-resistant screws (VR P/N 330020-635). <br /> NOTE:this bit is required to open and close the enclosure door. <br /> Under Dispenser Installation Steps <br /> 1. Before installing this device, turn Off, tag/lock out power to the system, including console and submersible <br /> pumps. <br /> 2. Determine which dispenser is closest to the tank being monitored. Remove that dispenser's lower sheet <br /> metal doors to gain access to the vapor plumbing. <br /> 3. Refer to Pressure Sensor dispenser installation examples in Figure 2 through Figure 6 to locate a suitable <br /> port or plumb a suitable fitting for the Pressure Sensor tubing in either the vapor return shear valve or in the <br /> 10-5 <br /> CARB Approved IOM 10-Veeder Root Pressure Sensor-Executive Order VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.