My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pressure Sensor Installation Under Dispenser Installation Steps <br /> Base of Dispenser Cabinet Junction box <br /> 1 (customer <br /> Cord grip supplied) <br /> 1 O Pressure -OR- <br /> Sensor Wrap rubber shim from connect these <br /> Cable <br /> io kit around sensor before 2 cables to TLS RF <br /> 1 inserting in clamp ,, ,, transmitters(W2) <br /> ----------- a" ----------------------- — ----- ------1 <br /> --- ---- — --- ---- ---- ---- ----j Tj ---- ---- <br /> ----------- <br /> ----------------------- -- -------- -------1 <br /> 1 sensing <br /> Seal off <br /> 1 port Cable l(customer <br /> _____________ 3 Vapor return line <br /> --�'—shear -- ----- ———————-I <br /> Top of 1 shear valve <br /> pedestall ------------- ------------------------ ------ ——————— <br /> i <br /> island <br /> ------------- -------------------------- ------- -------- <br /> 1 � 0 aG <br /> -- ------------------------ — o <br /> °�1------------ �° Goo <br /> 0 04 Pitch to drain 1/4" <br /> o 00 0 1 vertical per 12" 1 ty 1/4"OD copper 1 o o/\�,A <br /> 0 a0 0 horizontal �� 2 tube as required 1 do°Q0� ov 0 <br /> a <br /> °0 0 0 0 QI �� vapor flow Qo 0 0 0 0°��0 <br /> poo meter 0�,A 0�� <br /> d Qv0 j ' o� Q <br /> °o <br /> °) /�o�°0 1 4 2 , ���` Required'Y'fitting for Conduit to 1 00 0 �oC] 0 <br /> �� introducing liquid TLS Console 1 0 <br /> 1 duringTP-201.4 dynamic Flow Meter and Pressure 797-14.eps <br /> 1 backpressure test Sensor wiring can share 1 <br /> the same conduit to console <br /> 1 (Observe polarity!) 1 <br /> I 1 <br /> OR, 2 <br /> I 1 <br /> I 1 <br /> Dispenser 2"or 3"common main <br /> I _ _sump_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ vapor return line _ _I <br /> ONumbers in circle refer to item numbers(kit components)in Table 1 <br /> Figure 6. Example Pressure Sensor Install Below Vertical Access Fitting Or Vapor Return Line-ISD Installation(With Vapor Flow <br /> Meter Below Shear Valve) <br /> 10-11 <br /> CARB Approved IOM 10-Veeder Root Pressure Sensor-Executive Order VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.