My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pressure Sensor Installation Vapor Vent Stack Installation Step <br /> ONumbers in circle refer to item numbers <br /> Panel mounting (kit components)in Table 2. <br /> screws(4) <br /> 0 0 <br /> o Top symbol (on panel) <br /> 0 I' ° <br /> 0 Pressure sensor 1 <br /> o must be vertical <br /> O0 13 14 15 16 22 <br /> 5 <br /> 0 o O <br /> ( 3 <br /> ®© o ) <br /> o D <br /> 11 9 <br /> 0 <br /> Handle shown Longer portion of <br /> in operating bulkhead union <br /> position(down) 0 ® ® 'I inside enclosure.O <br /> i_ <br /> 0 <br /> 0 <br /> 12 Place large washers on both <br /> Flanged porous sides of enclosure wall. <br /> 797-2.eps 17 vent(factory installed) <br /> Figure 11. Mounting Pressure Sensor Assembly onto Composite Panel <br /> 21. Make sure the valve's handle is set to connect the sensor to the vapor vent stack and not to the capped <br /> (ambient) port. <br /> 22. Install two tamper-resistant screws from the enclosure hardware bag into the two holes on the enclosure <br /> door (if not already installed) using a Torx bit for tamper-resistant screws. Discard any remaining items in the <br /> enclosure hardware bag. <br /> 23. When direct wiring to a TLS console, install 1/2" electrical conduit from the conduit hub in the bottom of the <br /> enclosure to the customer supplied weather-proof junction box (see Figure 10). For wireless installations, <br /> using the TLS RF, Steps 23 - 27 are not required. <br /> 24. Route the cable from the pressure sensor to the junction box under the enclosure. Observing polarity, <br /> connect the sensor wiring to the field wiring from console and cap with wire nuts (see Figure 10). <br /> 25. Seal wire nuts in epoxy sealant following the instructions in Figure 8. <br /> 26. Push the epoxy sealed bag into the junction box. Replace and tighten the junction box cover. <br /> 10-16 <br /> CARB Approved IOM 10-Veeder Root Pressure Sensor-Executive Order VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.