My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISD Component Installation Connecting Cab/es To The Transmitter <br /> O <br /> 88999999 si 2 99999999 <br /> ■ <br /> PW N ,N <br /> P ERY <br /> ® o <br /> 964-42.eps <br /> Figure 18. Wiring The Transmitter <br /> LEGEND • - NUMBERED BOXES <br /> 1. Green LED—Unit status. 6. Cable from battery or DC power source. <br /> 2. Red LED—Radio status. 7. Cable from probe/sensor. <br /> 3. S2 DIP switch. 8. PROBE input terminals(PWR and GND). <br /> 4. Red LED—Flashes only when radio is powered on in Diagnostic OBSERVE POLARITY! <br /> Mode. 9. S1 DIP switch. <br /> 5. BATTERY power-in terminals(+IN and—IN).Observe polarity! <br /> QPay close attention to the polarity of the battery input con- <br /> nections.Reversing the connections can cause damage to <br /> the TLS RF. <br /> 10. To assure a water-tight seal between the cover and the enclosure, follow these steps: <br /> a. Insert the four cover screws through the cover and then press on the retaining washers to hold the screws <br /> in place. <br /> b. Make sure that the cover gasket is free of dirt and debris on both sides of the gasket and that the inside of <br /> the cover is clean in the gasket area. <br /> c. Position the gasket into the cover groove, assuring that it is pressed fully into the groove and sitting <br /> completely flat. <br /> d. Assemble the cover onto the enclosure, tightening the screws in a couple of turns each. Using an <br /> alternating 'X' pattern, continue to tighten the screws until they are all tight. <br /> 11. If you haven't done so already, attach the red battery labels from the installation kit onto the power cable below <br /> the power cord grip and at the battery pack connector or DC power source. <br /> 12. Do not attach the power cable at the battery pack or do power source until ready to begin the "Site Startup <br /> Procedure". <br /> to-2s <br /> CARE Approved IOM 10-Veeder Root TLS RF Wireless Systems(W2)-Exeeutive Order VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.