Laserfiche WebLink
Monthly Report <br /> ISD Operation Time. % <br /> The ISD operation time is the cumulative operation time of the VRM application. It is stated in CP-201 that the ISD system <br /> must be running 95% of the time on an annual basis. <br /> EVR Operating Requirements <br /> The EVR operating requirements list what EVR components are installed at the site and what each component should be <br /> operating at if applicable. <br /> EVR Pass Time. % <br /> The EVR pass time is the percentage of time the entire EVR system is not in an Alarm state. <br /> ISD Monitoring Requirements <br /> The ISD monitoring requirements are the limits in which alarms are triggered by. <br /> Warning. Failures <br /> This is a list of current and past warnings and failures that relate to VRM. <br /> Event Loa <br /> The event log shows a description of any shutdowns and the action to re enable any fueling points. <br /> Printing Reports <br /> Printing from a Web Browser <br /> Printing reports can be done directly from the web browser. Once a report is generated it can simply be printed by going to <br /> the File>Print on the on the web browser's tool bar. <br /> Printing from the Local LCD <br /> To print from the local LCD to the internal printer, press the print button=and it will navigate you to the print menu. <br /> From the print menu, you can choose the type of report you want to print. <br /> II-20 <br /> CANB Approved IN 11-INCON Vapor Recovery Monitoring(VRM)-Executive Order VR-202 <br />