Laserfiche WebLink
Reports & Printing <br /> Creating Reports <br /> Reports can be generated and printed based on the last 30 days, by month, or by year. The console stores ISD history for <br /> two years. <br /> Figure 9a and 9b - VRM Reports LCD View <br /> [VRM]Nenu URM]}Reports <br /> Ullage- Dispensers Control Daily � <br /> Pressure Ill����111 Il C��ji <br /> Fiw_1 <br /> Reports <br /> ® a223 <br /> 35 <br /> 07123!/ �wrr� 10117 05 <br /> 07 � ■ � � � <br /> Press <br /> Alarm Reports <br /> Alarm reports can be generated either from the System»Reports page or the VRM»Alarms web page. The <br /> System»Reports page will generate both the system alarms and application alarms while the VRM»Alarms will only <br /> generate VRM related application alarms. <br /> VRM Reports <br /> There are two different VRM reports that can be generated, a Daily Report and a Monthly Report. The Daily Report <br /> generates a list of results for each day on a rolling 30 day basis. The information included in the report is: <br /> Daily Report <br /> ISD Up-Time <br /> The ISD up-time is the percentage that the ISD System is running the VRM application. It calculates the up-time based on <br /> actual run-time during a 24-hour period. It is stated in CP-201 that the ISD system must be running 95% of the time on an <br /> annual basis. <br /> Highest and Lowest Ullage Pressure <br /> The highest and lowest ullage pressure is the highest and lowest average hourly pressure for each day. <br /> 7511 and 95th Percentile Ullage Pressure <br /> The VRM records and stores the 75th and 9511 highest ullage pressure for each day. <br /> Fueling Point Assessments <br /> This shows the daily status of each fueling point. There are four assessments that each fueling point can be classified <br /> into; pass, failure, warning, or insufficient data. <br /> II-25 <br /> CANB Approved IOM 11-INCON Vapor Recovery Monitoring(VRM)-Executive Order VR-202 <br />