My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
START-UP/NEW INSTALLATION FORM <br /> INCON VAPOR RECOVERY MONITORING(VRM)SYSTEM <br /> DATE <br /> INCON VRM Startup Checklist <br /> Service Company Name Telephone Number <br /> Service Technician INCON Tech Cert# <br /> Station Address City <br /> Phase I EVR Equipment Manufacturer Phase II EVR Equipment Manufacturer <br /> Dispenser Equipment Checklist YES NO Initials <br /> 1 Franklin Fueling Systems,. Healy Phase II EVR System including ISD System <br /> installed according to CARB E.O.VR-202? <br /> Is the Vapor Pressure Sensor test port installed in the correct direction?When the <br /> 2 ball valve is closed it should isolate the Vapor Pressure Sensor from the containment <br /> area.See Figure 11 of the procedure. If it is not then it must be configured such that <br /> the pressure sensor is isolated when the valve is closed. <br /> 3 Is the Pressure Sensor in the Open position with the plug in the test port?See Figure <br /> 11 of the procedure. <br /> 4 Was Oil and gasoline compatible PTFE Tape used on the threads for the Vapor Flow <br /> Meter rather than pipe dope? <br /> rj Was a pressure decay test run per TP201.3? <br /> 6 Was the Dispenser Vapor Line Integrity Test run to check for leaks in the dispensing <br /> equipment? <br /> Tank Sentinel Equipment Checklist YES NO Initials <br /> Was the dispenser maximum load current measured and recorded?Be sure the <br /> 7 proper size Relay Module is used. Use the 10A Relay Module if the current exceeds <br /> 2 Amps. <br /> Were the Gasoline Dispenser Hook Signals wired individually to the AC Input Module <br /> 8 with dipenser 1 wired to the first set of channels? Verify all non-gasoline hook signals <br /> are installed after the last gasoline hook signal. <br /> 9 Has the Administrator Password been set? <br /> 0 Was the External ATG alarm able to be generated and cleared? <br /> II-32 <br /> CARB Approved IBM 11-INCON Vapor Recovery Monitoring(VRM)-Executive Brder VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.