Laserfiche WebLink
START-UP/NEW INSTALLATION FORM <br /> INCON VAPOR RECOVERY MONITORING(VRM)SYSTEM <br /> DATE <br /> INCON VRM Startup Checklist <br /> Service Company Name Telephone Number <br /> Service Technician INCON Tech Cert# <br /> Station Address City <br /> Phase I EVR Equipment Manufacturer Phase II EVR Equipment Manufacturer <br /> Dispenser Equipment Checklist YES NO Initials <br /> 1 Franklin Fueling Systems,. Healy Phase II EVR System including ISD System <br /> installed according to CARB E.O.VR-202? <br /> Is the Vapor Pressure Sensor test port installed in the correct direction?When the <br /> 2 ball valve is closed it should isolate the Vapor Pressure Sensor from the containment <br /> area.See Figure 11 of the procedure. If it is not then it must be configured such that <br /> the pressure sensor is isolated when the valve is closed. <br /> 3 Is the Pressure Sensor in the Open position with the plug in the test port?See Figure <br /> 11 of the procedure. <br /> 4 Was Oil and gasoline compatible PTFE Tape used on the threads for the Vapor Flow <br /> Meter rather than pipe dope? <br /> rj Was a pressure decay test run per TP201.3? <br /> 6 Was the Dispenser Vapor Line Integrity Test run to check for leaks in the dispensing <br /> equipment? <br /> Tank Sentinel Equipment Checklist YES NO Initials <br /> Was the dispenser maximum load current measured and recorded?Be sure the <br /> 7 proper size Relay Module is used. Use the 10A Relay Module if the current exceeds <br /> 2 Amps. <br /> Were the Gasoline Dispenser Hook Signals wired individually to the AC Input Module <br /> 8 with dipenser 1 wired to the first set of channels? Verify all non-gasoline hook signals <br /> are installed after the last gasoline hook signal. <br /> 9 Has the Administrator Password been set? <br /> 0 Was the External ATG alarm able to be generated and cleared? <br /> II-32 <br /> CARB Approved IBM 11-INCON Vapor Recovery Monitoring(VRM)-Executive Brder VR-202 <br />