Laserfiche WebLink
REFE—ONle <br /> VFranklin Fueling Systems <br /> TS-VFM <br /> Installation Guide <br /> This install guide provides necessary installation instructions for the mounting of the INCON Vapor Flow Meter inside a dispenser or inside a dispenser <br /> sump. Information regarding the cabling and the connection to the Tank Sentinel Console is found in the Tank Sentinel Installation Guide(p/n 000- <br /> 2150). All documentation relating to operability,maintenance,and testing of the Vapor Flow Meter is found in the Vapor Recovery Monitor Operator's <br /> Guide(p/n 000-2058). <br /> Important: See the Vapor Recovery Install/Operators Manual or Tank Sentinel Installation Manual for Important Safety Messages. <br /> Required Tools Related Documents <br /> • Pipe joint tape(Oil and gasoline compatible PTFE Tape) 000-2058: Vapor Recovery Monitor Operators Guide <br /> • Pipe Wrench 000-2150: Tank Sentinel Installation Guide-TS-5XXX Series <br /> • Small screwdriver(terminal block connection) 000-2142: Tank Sentinel Programming Guide-TS-5XXX Series <br /> • Slip joint pliers(crimping splice connector) 000-2151 : Tank Sentinel Operator's Guide-TS-5XXX Series <br /> Preparation <br /> Only use approved pipe joint tape(Oil and gasoline compatible PTFE Tape)for joints connecting to the Vapor Flow Meter. The use of non hardening, <br /> "pipe-dope,"thread sealant is strictly prohibited and will void the warranty. <br /> 1. Perform a site inspection.Determine how the Vapor Flow Meter will be installed.The preferred installation method for this product is to install above the <br /> vapor shear valve. If there is not enough room between the vapor shear valve and the vapor pump,installation below the shear valve may be needed. <br /> 2. If the Vapor Recovery equipment is going to be installed on an existing service station,verify that there is a run of intrinsically safe conduit going back to <br /> the console.Vapor Flow Meter wiring can share the same space with other intrinsically safe cables,but cannot be run with non-intrinsically safe cables. <br /> 3. Make sure that all contractor-supplied piping materials are compatible with California fuels and meet all local codes. <br /> Parts List and Materials Needed <br /> Table 1 -Above Shear Valve Table 2-Below Shear Valve <br /> Item Description .. aItem Description .. e <br /> Vapor Flow Meter,TS-VFM INCON 1 Vapor Flow Meter,TS-VFM INCON 1 <br /> Sensor Installation Kit,020-1509 INCON 1 Sensor Installation Kit,020-1509 INCON 1 <br /> Weatherproof Junction Box Contractor 1 Weatherproof Junction Box Contractor 1 <br /> 1.5"to 1"reducing bushing Contractor 1 1.5"pipe nipple Contractor 2 <br /> 1.5"to_"reducing bushing' Contractor 1 1.5"pipe union Contractor 1 <br /> 1"pipe nipple Contractor 1 <br /> _"pipe nipple" Contractor 1 "-piping size is dependent on vapor piping size inside the dispenser.Typically <br /> the connection to a Healy VP1000 is a/2 NPT. Thus,the bushing size will be <br /> Pipe Union Contractor 1 1.5"to 0.5". <br /> Installation Steps <br /> Above Shear Valve Below Shear Valve <br /> 1. Lock and tag out power to the dispenser and the console before 1. Lock and tag out power to the dispenser and the console before attempting <br /> attempting any work on the dispenser. any work on the dispenser. <br /> 2. Refer to Figure 1 for reference. 2. Refer to Figure 2 for reference. <br /> 3. Do not remove the protective caps on the Vapor Flow Meter until 3. Do not remove the protective caps on the Vapor Flow Meter until you are ready <br /> you are ready to thread the nipples into the Flow Meter. to thread the nipples into the Flow Meter. <br /> 4. Begin by connecting the two 1.5"to 1"reducing bushings to the 4. Begin by connecting two 1.5"NPT pipe nipples to the Vapor Flow Meter's body. <br /> Vapor Flow Meter's body.Be sure to use only Oil and gasoline Be sure to use only Oil and gasoline compatible PTFE tape when sealing these <br /> compatible PTFE tape when sealing these threads.Take special threads.Take special precaution not to let any foreign material fall inside of the <br /> precaution not to let any foreign material fall inside of the Vapor Vapor Flow Meter. <br /> Flow Meter. 5. Next,prepare the piping inside of the dispenser sump to connect to the Vapor <br /> 5. Next,start assembling the hardware from the bottom up.Connect Flow Meter. If flexible piping is currently installed,make sure,when adding <br /> a short, 1"NPT threaded nipple to the top of the vapor shear the Vapor Flow Meter,that there are no bend radii that are too sharp,kinks, <br /> valve and to the 1.5"to 1"reducing bushing on the flow meter. or traps.The contractor may need to replace the existing flexible piping with a <br /> 6. Connect another 1"pipe nipple to the top reducing bushing shorter length in order to avoid potential flow restrictions. <br /> followed by a 1"pipe union.The existing dispenser piping can 6. Add the Vapor Flow Meter between the existing piping in the sump and the <br /> now connect to the top of the union. bottom of the vapor shear valve.In most cases the vapor shear valve will need <br /> 7. If there is not already a watertight junction box for the intrinsically to be temporary removed in order to assist with making the connection.Add a <br /> safe cables,then install one as described earlier in Tools union to either the top of the shear valve or below the shear valve. <br /> Required. 7. If there is not already a watertight junction box for the intrinsic safe cables,then <br /> 8. Pull the black Vapor Flow Meter cable through the supplied install one as described earlier in Tools Required. <br /> cable grip and into the junction box.Using the supplied 8. Pull the black Vapor Flow Meter cable through the supplied cable grip and into <br /> crimp connectors,splice the flow meter cable to the field the junction box.Using the supplied crimp connectors,splice the flow meter <br /> cable.The color codes on the black flow meter cable are: cable to the field cable.The color codes on the black flow meter cable are: <br /> Red=+(plus)and Black=—(minus) Red=+(plus)and Black=—(minus) <br /> II-I <br /> CARE Approved IDM 11-INCON Vapor Flow Meter(VFM)-Executive Order VR-202 <br />