My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 1:58:42 PM
Creation date
2/25/2021 4:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vapor Recovery <br /> j Fill Riser <br /> S <br /> w <br /> OPw <br /> Ball Float <br /> 14"PAnim urn <br /> Clearance for <br /> Tube Cut Roat 4" NPT <br /> per Local Nipple <br /> Requirements <br /> a <br /> +— Align Float Along L"th of Ts rtk –..� Swivel <br /> Product a Jack <br /> Adaptor Screw <br /> Kit <br /> Oneit socket <br /> adaptor be FOR TESTABLE MODELS ONLY= Check install a 0 oni <br /> tween jack again as done in Step 23 to ensure poppet actuates and <br /> screw bolts resets properly, See page 17 For fua testing details Ap- <br /> ply pipe dope to the socket adaptor threads. Pipe dope <br /> should he a non-hardening gasolnremsistant pipe <br /> thread seal compound. Install socket adaptor and <br /> torque to 3.5 ft-lbs(42 in-ts)minimurn to 5.4 ft-lbs(64 <br /> In-lbs) maximum. After installing socket adaptor where <br /> required,pressure test testakAe overfi it valve per CARR <br /> TP201.l O to ensure valve is vapor tight <br /> Fs&re 24A <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.