My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 1:58:42 PM
Creation date
2/25/2021 4:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S'l'ip 20, PREPARE FILL FUSER FOR VALVE JNSERTIION <br /> IMPORSAW)lisped the riser pipe for any foreign <br /> materlal, over sprayfrom tank relining yr any internal <br /> burrs inside of pipe must be removed prior to Installa- <br /> tion. Failure to have an unobstructed riser pipe may <br /> prevent paper installation or operatton orf the valve. <br /> Thwougtlty c{ean torp of vises ptpe. <br /> STEP 21; REMOVE ELAS MC$ANO <br /> Remove the elastic nand securing the float to the valve <br /> body. The(k)at wilt move into an outward position. <br /> STEP ZZ. INSERT DROP TU BE <br /> Make sure the upper 0-Rinq gasket is under the flange <br /> of the inlet tube. Hold the float down against the valve <br /> body and slowly Insert the drop lube overfill valve into <br /> the riser pipe. Do not force Yafve into the riser pipe_ If figure 23 <br /> any obstrurt*n or foreign matter lntetferrks with Make sure that the float is aligned along th@ aength of <br /> smooth}J)sertion of the valve,the riser pipe must be the tank. The length of the tank can easDy be deter- <br /> cleared. mined by locating outer manholes or pump boxes that <br /> are installed around other tank fittings, look Into the <br /> WARN K druptube and align the defiectorwitih thelength of the <br /> Failure to fdbw the as sem" tank. <br /> and InmI1 M" InstrwWrit or <br /> use of excewva force to Invert : Unthread the socket acfap- <br /> the OPW 71 SO will VOIDTHE for assembly from the inlet tube(a 3/8"s4uare drive <br /> WARRANTY. extension will attach to the socket adaptor.secure all <br /> *Ns to ensure they don't fall into the tank or valve)and <br /> Dl%r-ulty in rtmov6n4*ve ex1ming ensure fwat and poppet nloove Ireely when ux: etadeg <br /> fill tube(if there Is one)rneans for assem*Is pulled on. When looking down into the <br /> there may be an obstruction in the upper tube ensure poppet is visible when socket adap- <br /> riser pipe. Look for burrs,de(or tar is puited and resets properly when socket adaptor is <br /> mations,excess tank Ilnirrg maters- released, See paw 17 For full testing details_ If poppet <br /> A of other pre jecticm that may does riot actuatt treeN take appimpriate Steps to fof;tit <br /> interfere wfth easy insert ion of the I before proceeding. <br /> OFW 71 SO. The 71 SO is&%-.U9rwd <br /> for insertion into schedule 40 pipe. If piguw22 CAUTION: Pio obs;tructico in the tank can be within <br /> schedule 5l]pipe has been used for the 34'fr+aM Ow center of she riser pipe or the valve <br /> riser,t1w 7150 cannot be Installed. If seamed pipe has may not upwate prap.rly(See Figure 24). <br /> been used,Vhe internal welds bead may imPHeFe with <br /> the OP1M 71 Sa and praevem jnstalr 10n. If Tile OPW MP 2+Is ALIGN VALVE <br /> 7150 won't sEp in easily DDN'T FORCE M Damage re Install the DPW Jack Screw Kit and a 4` NPT ripple to <br /> the valve may result if excess force is used. Examine the lock the valve in place. Refer to the Installation Instruc- <br /> rlser pipe canrfuiV,determine the nature of dw obstruc- tions supplied with the Jack Screw Kit. Fwtastakrfc <br /> tion;take appropriate steps to ft"tow it. rnadels ensure thatthe racket adeptcr Is afigw t&so <br /> it does nvt i ntarfwe vw"t hajack scxaw kA,(see Fig <br /> STEP 23. WECK tNSTALLATION ure 24A). Install the Rotatable PmducT AdNAor(Refer <br /> Insert the limp tube all the way Into the tank until the to Installation Instructions supplied with the Product <br /> flange and gasket seat onw the top of the Face Seal Adaptor.) Make sure that the valve does not rotate <br /> Adaptor. The f)oat will siring nut into the operating whille tightening the adaptor by observiing the position <br /> position a0 passes fnte the tri%k. at ttie dewwt The vow nett mnm i1 pud iiwV <br /> that,Li%gtk .f the tirALorlift s4er2a. nePtat thi3slrP <br /> as necessary to¢tssure proper valve alignment. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.