My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO0052918
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
0
>
2900 - Site Mitigation Program
>
CO0052918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 10:51:25 AM
Creation date
3/5/2021 10:16:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
RECORD_ID
CO0052918
PE
2900
STREET_NUMBER
0
STREET_NAME
WALNUT GROVE
City
WALNUT GROVE
ENTERED_DATE
11/4/2020 12:00:00 AM
SITE_LOCATION
WALNUT GROVE & OTHERS
RECEIVED_DATE
11/4/2020 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Soil Investigations for Data Collection in the Delta <br />Initial Study/Proposed Mitigated Negative Declaration 188 <br />c) Substantially increase hazards due to geometric design feature (e.g., sharp <br />curves or dangerous intersections) or incompatible uses (e.g., farm <br />equipment)? <br /> <br />No impact: The Proposed Project does not include any changes to the existing <br />roadway. No sharp curves, dangerous intersection, or incompatible uses will result <br />from this Proposed Project; therefore, there will be no impact. <br /> <br />d) Result in inadequate emergency access? <br />Less than Significant Impact. Traffic delays may occur due to soil investigation <br />related activities. In case of an emergency, or if an emergency vehicle needs to <br />pass, easily moved equipment will be moved immediately to maintain emergency <br />vehicle access. On major roads, one full lane will be available at all times for <br />emergency vehicles. Emergency service providers will be notified of soil <br />investigation activities along roads that may cause delays. The Proposed Project <br />would not close access to any access roads and would not result in the redesign or <br />alteration of any public roadways, nor would emergency access be blocked. While <br />there would be a less than significant impact to emergency access, implementation <br />of Mitigation Measures MM HAZ-3, MM GHG-1, MM TRANS-1 and MM TRANS-2 <br />would further avoid, minimize and/or reduce the potential for impacts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.