Laserfiche WebLink
State of Californ ia DEPARTMENT OF WATER RESOURCES California Natural Resources Agency <br />Greenhouse Gas(GHG) Emissions Reduction Plan <br />Consistency Determination <br />For Projects Using Contractors or Other Outside Labor <br />This form is to be used by DWR project managers to document a DWR CEQA project's consistency with <br />the DWR Greenhouse Gas Emissions Reduction P lan. This form is to be used only when DWR is the <br />Lead Agency and when contractors or outside labor and equipment are used to implement the project. <br />Additional Guidance on filling out this form can be found at: <br />http://dwrclimatechanqe.water.ca.gov/guidance resources.cfm <br />The DWR Gree nh ouse Gas Emissions Reduction Plan can be accessed at: <br />h ttps://water.ca.gov/Programs/AII-Programs/Climate-Change-Program/Climate-Action-Plan <br />Project Name: Soil In vest igations for Data Collection in the Delta <br />Environmental Document Type: IS/M ND <br />Manager's Name: Caro lyn Bu ckman <br />Manager's E-mail: Caro lyn .Bu ckman@wa ter .ca .gov <br />Division: Executive <br />Office, Branch, or Field Division: Delta Conveyance <br />Short Project Description: <br />The proposed project consists of on-land and over water soil in ves tigation s, inc ludi ng1 67 soi l borings from 50 to 200 feet <br />below ground surface , 103 co ne-penetratio n tests from 50 to 200 fe et below ground surface , and up to 5 geophysical <br />survey in vestigation arrays . Soi l investigation locations are sp read through ou t the area that has been ide ntified as th e <br />potential stud y area for th e Del ta Conveyance. No ongoing operation or maintenance or em iss ions wil l be requ ired <br />post-project. <br />Project GHG Emissions Summary: <br />Total Construction Emissions 6,203.2 mtCO2e <br />Maximum Annua l Construction Emi ssions 4,135.5 mtCO2e <br />[!] All other emissions from the project not accounted for above will occur as o ngoing operational , <br />maintenance, or business activ ity emi ssions and therefore have already been accounted for and <br />analyzed in the GGERP. <br />Extraordinary Construction Project Determination: <br />Do total proj ect co nstruction emissions e xceed 25,000 mtCO2e for the entire constru cti on phase or exceed <br />12 ,500 mtCO2e in any sing le year of construction? <br />Yes -Project specific emissions mitigation measures hav e <br />[!] No-Add iti ona l analysis not req uired  been includ ed in the environmental analysis document for <br />th e project <br />DWR 9785c (New 9/18) Pa ge 1 of 2