Laserfiche WebLink
St ate of Californi a DEPARTMENT OF WATER RESOURCES Ca lifornia Natural Resources Agen cy <br />Project GHG Reduction Plan Checklist: <br />All Project Level GHG Emissions Reduction Measures have been incorporated into the design or  <br />implementation plan for the project. (Project Level GHG Emi ssio ns Reduction Measures) <br />Or <br />[!l All feasible Project Level GHG Emissions Reduction Measures have been incorporated into the <br />design or implementation plan for the project and Measures not incorporated have been listed <br />and determined not to apply to the proposed project (include as an attachment) <br />[!l Project does not conflict with any of the Specific Action GHG Emissions Reduction Measures <br />(SQecific Action GHG Emissions Reduction Measures) <br />Would implementation of the project result in additional energy demands on the SWP system of 15 GWh/yr <br />or greater?  Yes l!lNo <br />If you answered Yes, attach a letter documenting that the project has consulted with the DWR SWP Power <br />and Risk Office regarding the additiona l power requirements of the project. <br />Is there substantial evidence that the effects of the proposed project may be cumulatively considerable <br />notwithstanding the proposed project's compliance with the requirements of the DWR GHG Reduction Plan? <br /> Yes l!lNo <br />If you answered Yes, the project is not eligible for streamlined analysis of GHG emissions using the DWR <br />GHG Emissions Reduction Plan . (See CEQA Guidelines, section 15183.5, subdivision (b)(2).) <br />Based on the information provided above and information provided in associated environmental <br />documentation completed pursuant to the above referenced project, the DWR CEQA Climate Change <br />Committee has determined that: <br />[!l The entire proposed project is consistent with the DWR Greenhouse Gas Reduction Plan <br />and the greenhouse gases emitted by the project are covered by the plan's analysis. <br /> The operational and maintenance phase of the project is consistent with the DWR <br />Greenhouse Gas Reduction Plan and the greenhouse gases emitted by the project are <br />covered by the plan's analysis. Emissions from the construction phase of the proj ect are not <br />covered by the DWR Greenhouse Gas Emissions Reduction Plan and wi ll be mitigated as <br />part of the project. <br />Date : Project Manager Signature: <br />Date : 11/14/2019 C4 Approval Signature: <br />Attachments: <br />[!]GHG Emissions Inve ntory [!]List and Explanation of excluded Project level <br />GHG Emissio ns Reduction Measures <br />Links: <br />https://curren t.water.ca.qov/proqrams/icc/SitePaqes/Home.aspx <br />https://water.ca.gov/Proqrams/AII -Proq ram s/Climate-C hanqe-Proqram <br />O SWP Power and Risk Office <br />Consu ltation Letter <br />DWR 9785c (New 9/18) Page 2 of 2