Laserfiche WebLink
1/2" COOPER COLD WATER <br />1/2" COOPER HOT WATER <br />WASTE <br />GAS LINE <br />(E) 4" WASTE <br />FIXTURE FIXTURE VALUE <br />HAND SINK - PRIVATE USE <br />QUANTITY <br />2.5 <br />2 1 <br />TOTAL DEMAND OF FIXTURE UNIT VALUE:16.5 <br />FLUSH TANK TYPE - 1.6 GPF <br />WATER CLOSET - PUBLIC USE <br />(COLD WATER) <br />FIXTURE VALUE <br />(HOT WATER) <br />1 <br />0 <br />10.5 <br />1 <br />MOP SINK 1 1.5 1.5 <br />WASH SINK 1.5 1.52 <br />ICE MAKER 0.5 01 <br />NOTES : <br />1. PLUMBING MATERIALS : <br />WASTE / VENT PIPE : ABS ( VERIFY WITH BLDG. DEPT.) <br />COLD & HOT WATER PIPES : COPPER TYPE ' l ' <br />2. BACK FLOW PREVENTERS IF REQUIRED <br />TO BE DETERMINED ON SITE INSPECTION <br /> ASTM B88 <br />BUILDING INSPECTOR / CONTRACTOR NOTES: <br />1. CORROSION PROTECTION / WRAPPING IS REQUIRED <br /> ON ALL UNDER-SLAB FERROUS ELECTRICAL <br /> CONDUIT, WATER PIPING, BUILDING DRAINS, <br /> BUILDING SEWERS, FLOOR SINKS, FLOOR DRAINS, <br /> TRAP PRIMERS, WASTE DRAINS, AND OTHER <br /> FERROUS PIPING, INCLUDING ALL ZINC COATED <br /> GALVANIZED PIPING AND FITTINGS. <br />2. CORROSION PROTECTION / WRAPPING IS REQUIRED <br /> ON COPPER WATER PIPING PER MUNICIPAL CODE <br /> AND THE 2016 CPC <br />3. CORROSION PROTECTION SHALL BE INSPECTED AND <br /> APPROVED BY THE BUILDING INSPECTOR BEFORE <br /> COVERING <br />CO <br />DISHWASHER 1 2 2 <br />(N) 4" WASTEGREASE TRAP SIZING <br />1. 3-COMPARTMENT SINK : 18x18x12 = 3,888 CUBIC INCH <br /> 3,888 x 3 = 11,664 CUBIC INCH <br /> 11,664/236 = 49.42 GPM <br />2. PREP. SINK : 18x18x12 = 3,888 CUBIC INCH <br /> 3,888/236 = 16.47 GALLONS <br /> 16.47 x .25 = 4.18 GPM <br />3. MOP SINK : 6 GPM <br />4. DISHWASHER : 10 GPM <br />TOTAL DRAINAGE LOAD : 69.60 GPM <br />ACTUAL DRAINAGE LOAD : 69.60 x .75 = 52.20 GPM <br />FLOW RATE CAPACITY : 52.20 GPM x 2 = 104.4 LBS <br />A 100-GALLON GREASE TRAP IS REQUIRED4"OUTLET <br />INLET <br />2" VENT <br />CONTROL <br />FLOW 4"THERMOMETER <br /> FLUE <br />BALL VALVE <br />COLD WATER SUPPLY <br />P&T RELIEF VALVE <br />BRACE LINE TO WALL <br />DRAIN VALVE W/ <br />THREADED HOSE <br />RUN DISCHARGE <br />2" MIN <br />DIRT LEG <br />GAS COCK <br />DIELECTRIC UNION <br />(TYPICAL) <br />DRAFT DIVERTER <br />HOT WATER <br />GAS SUPPLY <br />VACUUM RELIEF VALVE <br />LINE TO MOP SINK4"MIN.METAL STRAPS <br />8. <br />7. <br />6. <br />5. <br />4. <br />3. <br />2. <br />CBC CODES. <br />STORM COLLAR. <br />VERIFY ROOF CONSTRUCTION. <br />METALBESTOS OR EQUAL. <br />NOTE:INSTALL FLUE AT HEIGHT <br />REQUIRED BY LOCAL AND <br />VENTILATED ROOF THIMBLE, <br />1. <br />TYPE "B" FLUE <br />DECKING. <br />ATTACH THIMBLE TO ROOF <br />FLASHING. <br />METALBESTOS VENT. <br />VENT CAP. <br />CONNECTION <br />PLUMBING FIXTURE UNIT <br />(N) 4" WASTE(N)1 1/2" MAIN LINECO <br />TO MAIN @ <br />PARKING LOT <br />3-COMP. <br />2" <br />HAND SINK <br />MOP <br />SINK <br />LAVATORY <br />VENT <br />WASTE <br />NOTES : <br />1. PLUMBING MATERIALS : <br />WASTE / VENT PIPE : ABS ( VERIFY WITH BLDG. DEPT.) <br />COLD & HOT WATER PIPES : COPPER TYPE ' l ' <br />2. BACK FLOW PREVENTERS IF REQUIRED <br />TO BE DETERMINED ON SITE INSPECTION <br /> ASTM B88 4" VTR2"4" VTRTOILET <br />TRAP <br />GREASE <br />4" <br />SINK <br />FLOOR <br />SINK <br />FLOOR <br />SINK <br />2"2" <br />2" <br />2" <br />2" <br />2" <br />4" <br />4" <br />4" <br />4" <br />4"4"4"4" <br />3"3" <br />3" <br />3" <br />3" <br />2" <br />2" <br />2" <br />2" <br />2"2" <br />2" <br />1-1/2" <br />1-1/2" <br />1" <br />1" <br />GAS LINE <br />1-1/2" <br />1-1/2" <br />1-1/2" <br />P01 <br />Revisions: <br />Date: <br />Page No:ADDRESS:OWNER:Drawn:RUBY BAKERY AND CAFEPERMIT#:SECOND CONTACT:APN#:11 S. CHURCH STLODI, CA 95240ZERTUCHE <br />DRAFTING & DESIGN <br />HORACIO ZERTUCHE <br />1050 N. CARPENTER, SUITE-J <br />MODESTO, CA 95351 <br />(209) 507-6036 <br />horacio@zertuchedrafting.com <br />FAUSTO ECHEVERRIALYNN ECHEVERRIA(415) 404-519409/01/20191 <br />10/04/20192 <br />11/21/20193ELECTRICALPLAN <br />Scale:1/4"-1'-0" <br />PLUMBING PLAN1 <br />Scale:1/4"-1'-0" <br />WATER HEATER/VENT DETAIL2 <br />Scale:1/4"-1'-0" <br />GREASE TRAP CALCULATIONS 3 <br />1 <br />1 <br />1 <br />Scale:1/4"-1'-0" <br />PLUMBING ISOMETRIC 4 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2