My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
11
>
1600 - Food Program
>
PR0546490
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 8:56:06 AM
Creation date
3/11/2021 2:31:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0546490
PE
1624
FACILITY_ID
FA0026353
FACILITY_NAME
RUBY'S BAKERY AND CAFE
STREET_NUMBER
11
Direction
S
STREET_NAME
CHURCH
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
11 S CHURCH ST STE B
P_LOCATION
02
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1050 N, CARPENTER RD. SUITE - J <br />MODESTO, CA 95351 <br />11 S. CHURCH ST. LODI, CA 95240------------------------------------F.S.J.R.09/17/2019AS NOTED22003REVISIONSNo.RemarksDRAWN:CHECKED:DATE:SCALE:JOB NO:DateSTAMP:SHEET TITLEToll Free: 800-498-4110 <br />Ceres, CA 209-538-2879 Fax: 209-538-2885 <br />www.califliving.comDrnSHEETREVISIONSNo.RemarksDRAWN:CHECKED:DATE:SCALE:JOB NO:DateSTAMP:SHEET TITLEToll Free: 800-498-4110 <br />Ceres, CA 209-538-2879 Fax: 209-538-2885 <br />www.califliving.comDrnSHEETC-2552James W. B. Shade1.UG SERVICE TERMINATION ENCLOSURE, MAIN DISCONNECT FOR SINGLE FAMILYDWELLINGS SHALL BE PER PG&E GREENBOOK DOCUMENT 058817.2.SERVICE LATERAL TRENCHING, CONDUIT AND BACKFILL SHALL BE PER PG&E GREENBOOKDOCUMENT 063927.3.FOR SERVICE LATERALS 75 FT OR GREATER IN LENGTH, CONTACT PG&E TO VERIFYCONDUIT AND TERMINATION REQUIREMENTS, ADJUST CONDUIT AND MAIN SERVICE SIZEACCORDINGLY PER GREENBOOK DOCUMENT 063927.4.LOCATION OF THE METER PANEL COMBINATION.EQUIPMENT MAY BE INSTALLED ATOPPOSITE END OF BUILDING AS REQUIRED, BASED ON TRANSFORMER LOCATION, REFERTO SITE UTILITY PLAN.5.REQUIRED WORKING SPACE CLEARANCES CEC 110.26:DEPTH - 42in.WIDTH - 30in. or WIDTH OF EQUIPMENT WHICHEVER IS GREATERHEIGHT - 6 12 ft. OR EQ. HEIGHT WHICHEVER IS GREATER6.THE MAIN ELECTRICAL SERVICE SHALL HAVE A RESERVED SPACE TO ALLOW FOR THEINSTALLATION OF A DOUBLE POLE CIRCUIT BREAKER FOR A FUTURE SOLAR ELECTRICINSTALLATION, LOCATED AT THE OPPOSITE END OF THE BUS BAR AS THE FEEDERCONDUCTORS, AND BE LABELED FOR FUTURE SOLAR ELECTRIC."8.PROVIDE A WORKING SPACE CLEARANCE OF 36" INFRONT HVAC DISCONNECT AS PERCEC110.26(A)(1) AND DISCONNECT SHALL BE LOCATED WITHIN SIGHT FROM AND READILYACCESSIBLE FROM THE AC UNIT, THE DISCONNECTS SHALL BE PERMITTED TO BEINSTALLED WITHIN THE UNIT AND DISCONNECTS AND DISCONNECTS SHALL NOT BELOCATED ON PANELS THAT ARE DESIGNED TO ALLOW ACCESS TO THE EQUIPMENT OR TOOBSCURE THE EQUIPMENT NAMEPLATE AS PER CEC440.14.KEYNOTES1.VERIFY WITH SERVICE PLANNER FOR AIC RATING AND ELECTRICAL INFOR BEFOREISSUING ANY BID. NOTIFY ENGINEER IMMEDIATELY IF MAJOR DISCREPANCIES OCCURS.SINGLE LINE DIAGRAM NOTESE-1.1PANEL LOADSCHEDULEPANEL SCHEDULE1SCALE: N.T.SPANEL SCHEDULE NOTES:
The URL can be used to link to this page
Your browser does not support the video tag.