My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
2224
>
2300 - Underground Storage Tank Program
>
PR0232555
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 9:35:25 AM
Creation date
3/16/2021 7:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232555
PE
2361
FACILITY_ID
FA0003679
FACILITY_NAME
CALIFORNIA STOP*
STREET_NUMBER
2224
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16313007
CURRENT_STATUS
01
SITE_LOCATION
2224 MANTHEY RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 1, 2021 <br />SAN 10AQUIN <br />COUNTY <br />Greatness grows here. <br />Deborah Jones <br />Elite IV Contractors <br />2535 Wigwam Drive <br />Stockton, Ca 95742 <br />dispatch@eliteiv.com <br />Re: California Stop <br />2224 Manthey Road, <br />Stockton, Ca 95206 <br />Environmental Health Department <br />Jasjit Kang, RENS, Director <br />Muniappa Nam, REHS, Assistant Director <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Willy Ng, REHS <br />Michael Kith, REHS <br />Melissa Nissim, REHS <br />SR0083468 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of the <br />application for a permit to replace the direct -bury diesel spill container on the underground storage <br />tank (UST) system at the above noted address. The permit has been approved with the following <br />conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br />any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval prior to <br />commencing work. All new addenda supersede the previous ones. <br />3. Provide written notification to ustt�slgov.orq to arrange the following inspection appointments <br />(a 48-hour notice is required for inspection appointments). <br />a. Corrosion protection: Verify corrosion protection for direct bury spill bucket prior to <br />backfilling. <br />b. Spill bucket test: Verify minimum 5 -gallon capacity and pass a one hour hydrostatic test (or <br />equivalent). Proper drainage must also be verified. <br />c. Since concrete will be broken near the diesel tank, a secondary containment test must be <br />performed on the diesel tank once concrete is poured in accordance with the <br />manufacturer's guidelines. <br />Please be aware that the facility cannot receive fuel in the diesel tank prior to the EHD <br />inspection and approval. <br />4. Any individual performing the work of a service technician must meet the following <br />qualifications: <br />a. Possess or be employed by a person who possesses one of several permissible valid, <br />current contractor's licenses issued by the Contractors State License Board (may be issued <br />to the installation company), or a Tank Tester's license issued to the individual by the State <br />Water Board <br />b. Possess or work under the direct and personal supervision of an individual physically <br />present at the work site who possesses a valid, current California UST Service Technician <br />certificate issued by the International Code Council (ICC) <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 <br />www.sjgov.org/ehd <br />
The URL can be used to link to this page
Your browser does not support the video tag.