My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
2224
>
2300 - Underground Storage Tank Program
>
PR0232555
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 9:35:25 AM
Creation date
3/16/2021 7:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232555
PE
2361
FACILITY_ID
FA0003679
FACILITY_NAME
CALIFORNIA STOP*
STREET_NUMBER
2224
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16313007
CURRENT_STATUS
01
SITE_LOCATION
2224 MANTHEY RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J 0 A Q I I I Irl Environmental Health Department <br /> CCUNT <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> CALIFORNIA STOP* 2224 MANTHEY RD, STOCKTON March 17, 2021 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator failed to check and note the correct test dates for the secondary <br /> containment test on the October 2020 through March 2021 designated operator inspection reports. The secondary <br /> containment test was performed on 10/12/2020 per the test results that were found on site. <br /> REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> ------------------------------ <br /> ------------------------------ <br /> OBSERVATION: Designated operator reports were not signed within the required time frame. The April 2020 <br /> through March 2021 reports were not signed and dated by the owner/operator. <br /> REGULATORY GUIDANCE:Within 48 hours of the completion of the designated UST operator visual inspection, <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report,the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues. <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future. <br /> This is a repeat violation, Class II. <br /> 210 CCR 2715(c)Failure to provide initial training,train every 12 months, and have a trained employee present. <br /> OBSERVATION: The designated operator employee refresher training has not been provided for the site <br /> employees. The most recent training certification found on site was dated 02/03/2020. <br /> REGULATION GUIDANCE: The designated operator shall train facility employees in the proper operation and <br /> maintenance of the UST system at least once every 12 months. The training shall be conducted before the <br /> individual performs the duties of a facility employees.The training shall include, but is not limited to: <br /> 1. Operation of the UST system in a manner consistent with the facility's best management practices <br /> 2. Employee's role with regard to monitoring equipment as specified in the facility's monitoring plan <br /> 3. Employee's role with regard to spills and overfills as specified in the facility's response plan <br /> 4. Name of the contact person(s)for emergencies and monitoring equipment alarms <br /> Initial training shall also include a site-specific practical demonstration that provides both sharing information and <br /> evaluating knowledge for responding to emergencies, leak detection, monitoring alarms, spills and overfills. At least <br /> one of the facility employees present during operating hours shall have current training. <br /> CORRECTIVE ACTION: Ensure that employees have been trained by the designated operator, maintain the list on <br /> site, and submit a copy of the training records to the EHD. <br /> This is a Class II violation. <br /> FA0003679 PR0232555 SCO01 03/17/2021 <br /> EHD 23-01 Rev.9/16/2020 Page 5 of 7 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.