|
STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA (—
<br /> Electrical Power Distribution Electrical Power Distribution Electrical Power Distribution . U
<br /> NRCC-ELC-E(Created 12/17) CALIFORNIA ENERGY COMMISSION NRCC-ELC-E(Created 12/17) CALIFORNIA ENERGY COMMISSION NRCC-ELC-E(Created 12/17) CALIFORNIA ENERGY COMMISSION .
<br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-E CERTIFICATE OF COMPLIANCE NRCC-ELC-E CERTIFICATE OF COMPLIANCE NRCC-ELC-E
<br /> This document is used to demonstrate compliance with mandatory requirements in 130.5 for electrical systems in newly constructed nonresidential, high-rise residential and Project Name: TRU BY HILTONReport Page: Page 2 of 5 Project Name: TRU BY HILTON lReport Page: Page 3 of 5
<br /> hotel/motel occupancies. Additions and alterations to electrical service systems in these occupancies will also use this document to demonstrate compliance per§141.0(0)or Project Address: 161 E LOUISE AVE JDate Prepared: 3/5/2019 Project Address: 161 E LOUISE AVE JDate Prepared: 3/5/2019
<br /> §141.0L 2P for alterations.
<br /> i� Project Name: TRU BY HILTON Report Page: Page 1 of 5 D. EXCEPTIONAL CONDITIONS 01 02 03 04 05 U
<br /> UN
<br /> Project Address: 161 E LOUISE AVE Date Prepared: 3/5/2019 This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form. L.1_
<br /> Location of
<br /> , Minimum Required Separation of Z Field Inspector
<br /> o A. GENERAL INFORMATION Table H indicates voltage drop calculations will be provided by the contractor. Load Type per Table 130.5-B Load per Table 130.5-B Compliance Method Requirements in Construction
<br /> 01 Project Location (city) LATHROP 02 Occupancy Types Within Project: Documents Pass Fail RED INC ARCHITECTS
<br /> > ✓❑ Office ❑ Retail ❑ Warehouse ❑ Hotel/Motel ❑ School Support Areas E.ADDITIONAL REMARKS 6 All plug load separated b floor, 209. d STREET, MODESTo, CA 95354
<br /> p g p y 209.522 8900
<br /> ❑ Parking Garage E] High-RiseResidential E] Relocatable ✓❑ Other(Write In): HOTEL type or area Groups of plug loads
<br /> z This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. Plug Loads and appliances<25kVA Method 1 E502, E503 ❑ ❑
<br /> o exceeding 25 kVA connected load
<br /> 0 B. PROJECT SCOPE in an area less than 5000 sf SEAL:
<br /> a Table Instructions:Include any electrical service systems that are within the scope of the permit application. *NOTES:If"Other*"is selected under Compliance Method above,please indicate how compliance has been achieved in the space provided below.
<br /> W 01 02 03 04 05 Reset Add Row Remove Last
<br /> W F.SERVICE ELECTRICAL METERING
<br /> Demand Response Controls 'FOOTNOTES:For each separate load type, up to 10%of the connected load may be of any type. C.S
<br /> N Table Instructions:Complete the table below for new or replacement electrical service systems OR equipment to demonstrate compliance with§130.5Lo . �
<br /> Where required,demand response controls must be specified 'Method 1:Switchboards/motor control centers/panelboard loads disaggregated for each load type ply
<br /> Electrical Utility Provided 01 02 03 04 05 Method 2:Switchboards/motor control centers/panelboard supply other distribution equipment with loads disa re ated or each load type
<br /> z Service Rating Metering System which are capable of receiving and automatically responding to pp ygg g f yp No. E14303
<br /> �
<br /> Scope of Work at least one standards based messaging protocol which Required Metering Capabilities per Table 130.5-A Method 3:Complete meteringsystem measures and reports loads b type * Exp.
<br /> 6-30-19
<br /> Designation/ (kVA) Exception to Field Inspector
<br /> CL �
<br /> , enables demand response after receiving a demand response Electrical Service Rating Tracking kWh for Location of Requirements in See Chapter 8 of the Nonresidential Compliance Manual for more detail on Compliance Methods. F(
<br /> o Description 130.5 a Instantaneous Historical Peak kWh per rate p �Q•
<br /> W signal. Sections 120.2 130.1 and 130.3 and compliance Designation/Description (kVA) user-defined Construction Documents 9r fCTRIG
<br /> 0 Demand (kW) Demand (kW) period Pass Fail F �
<br /> v documents NRCC-MCH, NRCC-LTI and NRCC-LTS will indicate periodCA►
<br /> H.VOLTAGE DROP OF -�F
<br /> w MAIN SERVICE"MS" New electrical service equipment&meter 720 ❑ when demand response controls are required.
<br /> Remove Last MAIN SERVICE"MS" 720 E501 Table Instructions: Please complete this tablefor entirely new or complete replacement electrical power distribution systems, or alterations that add, modify or replace both
<br /> a
<br /> feeders and branch circuits to demonstrate compliance with 130.5c. For alterations, only the altered circuits must demonstrate compliance per§141.0(b)2Piii.
<br /> cn 'FOOTNOTES:Applicable if the utility company is providing a metering system that indicates instantaneous kW demand and kWh for a utility-defined period. G.SEPARATION OF ELECTRICAL CIRCUITS FOR ENERGY MONITORING 01 02 03 04 05
<br /> Table Instructions: Complete this table for entirely new or complete replacement electrical power distribution systems to demonstrate compliance with§130.5(b). Using the Electrical Service Combined Voltage Drop on Installed Feeder/Branch Location of Voltage Drop Sheet Number for Voltage Drop Field Inspector
<br /> N C.COMPLIANCE RESULTS dropdown choices in column 01, indicate the load types included for each service. Any load types that are not included in the service do not need to be shown. , Calculations in Construction
<br /> X Designation/Description Circuit Conductors Compliance Method Calculations CONSULTANT:
<br /> Table Instructions:If this table says "DOES NOT COMPLY"refer to Table D.for guidance and review the Table that indicates "No". Documents Pass Fail
<br /> o Electrical Service Designation/Description: MAIN SERVICE MS
<br /> 01 02 03 04 05 01 02 03 04 05 Permitted by CA Elec
<br /> z Service Electrical Separation for MAIN SERVICE"MS" Voltage drop<5% [:]Code(Exception to Contractor Responsible
<br /> Controlled ❑ ❑
<br /> Voltage Drop §130.5(c)) • HCS.
<br /> §130.5(a) 130.5 b130.5 d Load Type per Table 130.5-BCom
<br /> cn Metering AND Monitoring AND AND Receptacles Location of
<br /> 130.5 c Compliance Results e ' Minimum Required Separation of Field Inspector *NOTES If"Permitted by CA Elec Code*"is selected under Compliance Method above,please indicate where the exception applies in the space provided below.
<br /> Compliance Method' Requirements in Construction
<br /> W Load per Table 130.5-B ,
<br /> W Documents FOOTNOTES: Voltage drop calculations may be attached to the permit application outside the construction documents if allowed by the Authority Having Jurisdiction. Select Engineering
<br /> z (See Table F) (See Table G) (See Table H) (See Table 1) Pass Fail "attached"i applicable. 1 calculations will be the responsibility o the installing contractor,select"Contractor Responsible".in f pp f p Y f g p 50 years
<br /> N Yes AND Yes AND Yes AND Yes COMPLIES Lighting including exit,egress and exterior All lighting disaggregated by floor, Method 1 E502, E503 El F-14512 Feather River Dr#F,Stockton,CA 95219
<br /> F_ type or area 209-478-8270 1 www.hcs-eng.com
<br /> HVAC in aggregate and each I. CIRCUIT CONTROLS FOR 120-VOLT RECEPTACLES AND CONTROLLED RECEPTACLES gcom
<br /> HVAC systems and components Method 1 E503 ❑ ❑ Table Instructions:Please complete this table for entirely new or complete replacement electrical power distribution systems to demonstrate compliance with§130.5(d). Both
<br /> HVAC load rated at least 50 kVA ®Richard C.Smith,PE richard@hcs-eng.com
<br /> Table Continued controlled and uncontrolled receptacles must be provided in office areas, lobbies, conference rooms, kitchen areas in office spaces, copy rooms and hotel/motel guest rooms. ❑Bhupendra Patel,PE bhupendra@hcs-eng.com
<br /> Table Continued ❑Elizabeth Aguilar dizabeih@hcs-eng.com
<br /> PROJECT#2018.338
<br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance:http://www.energy.ca.gov/title24/2016standards December 2017 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance:http://www.energy.ca.gov/title24/2016standards December 2017 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance:http://www.energy.ca.gov/title24/2016standards December 2017
<br /> STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> Electrical Power Distribution Electrical Power Distribution
<br /> NRCC-ELC-E(Created 12/17) CALIFORNIA ENERGY COMMISSION NRCC-ELC-E(Created 12/17) CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-E CERTIFICATE OF COMPLIANCE NRCC-ELC-E
<br /> Project Name: TRU BY HILTON Report Page: Page 5 of 5 Project Name: TRU BY HILTON Report Page: Page 4 of 5
<br /> Project Address: 161 E LOUISE AVE JDate Prepared: 3/5/2019 Project Address: 161 E LOUISE AVE JDate Prepared: 3/5/2019
<br /> DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 6 01 02 03 04 05 06
<br /> Documentation Author Name: RICHARD SMITH Documentation Author Signature:Richard Smith PE Digitally signed by Richard Smith,PE Permanent
<br /> Date:2019.03.051620:20-08'00' Location of Requirements Field Inspector
<br /> Electrical Service Location/Type of Controlled Shut-Off Controls Durable in Construction
<br /> Company: HCS Engineering, Inc. Signature Date: Designation/Description Receptacles Marking Will
<br /> Address: 4512 FEATHER RIVER DR#F CEA/HERS Certification Identification (if applicable): E14303
<br /> be Used Documents Pass FlFail 41
<br /> City/State/Zip: STOCKTON,CA 95219 Phone: 209-478-8270 MAIN SERVICE"MS" Split-wired receptacles Occupancy Sensor E301 ❑ I ❑ by HILTON~
<br /> RESPONSIBLE PERSON'S DECLARATION STATEMENT Add Row Remove Last
<br /> certify the following under penalty of perjury,under the laws of the State of California: *If"Other*"is selected under Compliance Method above,please indicate how compliance has been achieved in the space provided below.
<br /> 1. The information provided on this Certificate of Compliance is true and correct. J. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION
<br /> 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Table Instructions:Selections have been made based on information provided in previous tables of this document. If any selection needs to be changed,please explain why in Q
<br /> Compliance(responsible designer) Table E.Additional Remarks. These documents must be provided to the building inspector during construction and can be found online at http:// z
<br /> 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or system design identified on this www.energy.ca.aov/2015publications/CEC-400-2015-033/appendices/forms/NRC( Wp
<br /> Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. Ll
<br /> Field Inspector J
<br /> 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable YES NO Form/Title
<br /> compliance documents,worksheets,calculations,plans and specifications submitted to the enforcement agency for approval with this building permit application. Pass Fail U
<br /> 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the building,and made available NRCI-ELC-01-E-Must be submitted for all buildings. ❑ ❑
<br /> to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the
<br /> documentation the builder provides to the building owner at occupancy. K. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE
<br /> Responsible Designer Name: RICHARD SMITH PE#E14303 Responsible Designer Signature:Richard Smith PE Digitally 2019.03.05 Richard Smith,PE
<br /> p g p g g Date:2019.03.°516'20:3°-°8•°°' There are no Certificates of Acceptance applicable to electrical power distribution requirements.
<br /> Company: HCS ENGINEERING Date Signed:
<br /> Address: 4512 FEATHER RIVER DR SUITE "F" License: ELECTRICAL ENGINEER
<br /> City/State/Zip: STOCKTON,CA 95219 Phone: 209-478-8270
<br /> 0 W
<br /> Q
<br /> U
<br /> N
<br /> � )
<br /> 0 W
<br /> Q � h
<br /> U � �
<br /> C
<br /> 0 O
<br /> W
<br /> IIS >.
<br /> O
<br /> C
<br /> s W
<br /> •E CA Building Energy Efficiency Standards-2016 Nonresidential Compliance:http://www.energy.ca.gov/title24/2016standards December 2017 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance:http://www.energy.ca.gov/title24/2016standards December 2017
<br /> N
<br /> t O
<br /> N
<br /> o O
<br /> z
<br /> •3
<br /> -o a
<br /> •0 o
<br /> 0
<br /> U z
<br /> L O
<br /> O 1=
<br /> o Z) O
<br /> v
<br /> F—
<br /> V)V)
<br /> o_ z
<br /> O Q
<br /> -d
<br /> a�
<br /> co
<br /> v
<br /> REVISIONS:
<br /> Q2 HILTON 10/18/2018
<br /> v
<br /> E
<br /> rn
<br /> c
<br /> •3
<br /> v
<br /> L
<br /> —v
<br /> Cn
<br /> t
<br /> U
<br /> N
<br /> U
<br /> i
<br /> Q
<br /> RED PROJECT # 18050
<br /> c
<br /> o HILTON # 18-428ND
<br /> PLANNING # SPR-18-102
<br /> o PERMIT # -
<br /> APN # 196-270-23
<br /> a�
<br /> CL DATE: 11.12.18
<br /> 0-
<br /> _0 DRAWN: BA
<br /> a�
<br /> CHECKED: RCS
<br /> rn
<br /> 0-
<br /> 0
<br /> U
<br /> SHEET TITLE:
<br /> ELECTRICAL POWER
<br /> DISTRIBUTION COMPLIANCE
<br /> .Cl)
<br /> L
<br /> Q)
<br /> O
<br /> L
<br /> O
<br /> 1`
<br /> •L
<br /> 0—
<br /> SHEET NO.:
<br /> •3
<br /> v
<br /> ET24A
<br /> FILE: K:\2018\301-400\RED Tru Hilton Lath rop\ET24.d wg Mar 05, 2019 — 5:29pm richard
<br />
|