Laserfiche WebLink
AMENDMENT TO MONITORING AND REPORTING PROGRAM -3- <br />FOR MUNICIPAL SOLID WASTE LANDFILLS <br />5. Constituents -of -Concern (COC) Leachate Detection Report <br />The discharger shall report to the Board by no later than 31 January of a given year the <br />analytical results of the leachate sample taken the previous Fall, including an identification of <br />all detected COCs in Attachment 3 that are not on the MSWLF's Constituent of Concern list <br />(non -CDCs). <br />During any year in which an Spring leachate retest is performed, the discharger shall submit a <br />report to the Board, by no later than 31 July of that year, identifying all constituents which <br />must be added to the MSWLF's COC list as a result of having been detected in both the <br />(previous calendar year's) Fall sample and in the Spring retest sample. <br />1. Detection Monitoring Program (DMP) under revised Article 5 <br />Each Discharger shall comply with the following detection monitoring program by 9 October <br />1994, unless and until the Board revises the waste discharge requirements for the MSWLF to <br />include an alternative detection monitoring program that complies both with the federal MSW <br />regulations and with the most recent revisions to Article 5 of Chapter 15. <br />For each monitored medium, all Monitoring Points assigned to detection monitoring, and all <br />Background Monitoring Points shall be monitored once each Fall/Winter and Spring/Summer <br />(Fall/Winter and Spring/Summer Reporting Periods end on 31 March and 30 September, <br />respectively) for the Monitoring Parameters listed in this Program. <br />For any given monitored medium, a sufficient number of samples shall be taken from all <br />Monitoring Points and Background Monitoring Points to satisfy the data analysis requirements <br />for a given Reporting Period, and shall be taken in a manner that ensures sample independence <br />to the greatest extent feasible. <br />Ground water sampling shall also include an accurate determination of the ground water <br />surface elevation and field parameters (pH, temperature, electrical conductivity, turbidity) for <br />that Monitoring Point or Background Monitoring Point. Ground water elevations taken prior <br />to purging the well and sampling for Monitoring Parameters shall be used to fulfill the Spring <br />and Fall ground water gradient/direction analyses required. For each monitored ground water <br />body, the discharger shall measure the water level in each well and determine ground water <br />gradient and direction at least quarterly, including the times of expected highest and lowest <br />elevations of the water level for the respective ground water body. Ground water elevations <br />for all background and downgradient wells for a given ground water body shall be measured <br />within a period of time short enough to avoid temporal variations in ground water flow which <br />could preclude accurate determination of ground water gradient and direction. This <br />information shall be included in the twice -yearly monitoring reports. <br />