Laserfiche WebLink
- 2 - <br /> PA - 2200045 ( SA ) <br /> REQ IIREMENT & <br /> The app ' " Gant shall the fellow belere the epFt1- eRt of DuhIiVVeFks <br /> o <br /> u <br /> n <br /> OR the n�retfee SGhed ilo is req iirorl 1 <br /> + r ,, , I <br /> tt ettt <br /> i the f0lleWiRg Genditiens ef Approval shall apply . <br /> RECOMMENDATIONS : <br /> 1 ) An encroachment permit shall be required for all work within road right- of-way . ( Note : <br /> Driveway encroachment permits are for flatwork only — all vertical features , including but <br /> not limited to fences , walls , private light standards , rocks , landscaping and cobbles are not <br /> allowed in the right- of-way . ) ( Development Title Sections 9 - 1145 . 4 and 9 - 1145 . 5 ) <br /> 2 ) Prior to issuance of the building permit , the driveway approach shall be improved in <br /> accordance with the requirements of San Joaquin County Improvement Standards <br /> Drawing No . R - 17 [ return radii for truck-trailer egress shall be designed to prevent <br /> encroachment onto opposing lanes of traffic] ( Development Title Section 9 - 1145 . 5 ) <br /> 3 ) A copy of the Final Site Plan shall be submitted prior to release of building permit . <br /> 4 ) The Traffic Impact Mitigation Fee shall be required for this application . The fee is due and <br /> payable at the time of building permit application . The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record . ( Resolution R - 00 - 433 ) <br /> 5 ) The Regional Transportation Impact Fee shall be required for this application . The fee is <br /> due and payable at the time of building permit application . The fee will be based on the <br /> current schedule at the time of payment . ( Resolution R - 06 - 38 ) <br /> 6 ) Prior to release of the building permit the applicant shall submit the Storm Water Pollution <br /> Prevention Plan ( SWPPP ) to Public Works . A copy of the approved SWPPP and all <br /> required records , updates , test results and inspection reports shall be maintained on the <br /> construction site and be available for review upon request . <br />