Laserfiche WebLink
- 3 - <br /> PA- 2200045 ( SA) <br /> 7 ) Prior to release of the building permit , the owner shall enter into an agreement with San <br /> Joaquin County for post- construction maintenance of stormwater quality facilities . <br /> 8 ) Applicant shall file a Notice of Intent ( NOI ) with the State Water Resources Control Board <br /> ( SWRCB ) and comply with the State " General Permit for Storm Water Discharges <br /> Associated with Construction Activity " . The Waste Discharge Identification Number <br /> (WDID ) , issued by SWRCB , shall be submitted to Public Works prior to release of the <br /> building permit . Contact the SWRCB at ( 916 ) 341 - 5537 for further information . <br /> 9 ) This project is subject to the NPDES Region -Wide Permit requirements and shall comply <br /> with the following conditions . Prior to release of the building permit , plans and calculations <br /> shall be submitted and approved by the Public Works Department — Water Resources <br /> Division ( 209 - 468 - 3605 : <br /> a ) Treatment : A registered professional engineer shall design the site to treat the 85th <br /> percentile storm as defined in the County ' s 2021 Storm Water Quality Control Criteria <br /> Plan ( SWQCCP ) . <br /> b ) Hydromodification : A registered professional engineer shall design the site to comply <br /> with the volume reduction requirement outlined in the County ' s 2021 SWQCCP . <br /> CH : AC <br />